Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/08/2023
Applicant:
Daria Hopkins
Description:
SFR 130.1600 T21-M0030

Permit Reviews

Permit Number - TC-MDP-0523-00997
Permit Status: Complete
Permit Description: SFR 130.1600 T21-M0030
Start Date Submittal Complete Date Status  
02/27/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/04/2024 APPROVED Review Details
09/08/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/20/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0523-00997
Permit Status: Complete
Permit Description: SFR 130.1600 T21-M0030
Date Description Comments
09/08/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/08/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/20/2023 Post-Tension Inspection Report is required.
05/11/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/20/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-00997
Permite Description: SFR 130.1600 T21-M0030
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/08/2023 COT - RSBU - Exterior Clips/Sheathing N/A Re-inspection required Add nails to stud for garage shear wall, shear wall in master bedroom not per nailing schedule, add nails to sole plate at bedroom closet behind garage, missing truss calcs.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-00997
Permit Description: SFR 130.1600 T21-M0030
Total Completed Inspections - 22
Date Description Inspector Results Comments
11/06/2023 COT - RSPL - Yard Water Line Passed 11/6/23: under pressure ok to backfill. Shading required.
11/06/2023 COT - RSPL - Backwater Valve Passed
11/07/2023 COT - RSPL - Rough Soil Passed
11/07/2023 COT - RSPL - Sewer Passed
11/14/2023 COT - RSEL - Electrical Underground Passed
11/14/2023 COT - RSEL - Grounding/Bonding Passed
11/15/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
11/15/2023 COT - RSBU - Preslab Passed
12/08/2023 COT - RSBU - Roof Nailing Passed
01/25/2024 BULD - Electrical Clearance Passed
02/06/2024 COT - RSBU - Exterior Clips/Sheathing Passed
02/06/2024 COT - RSPL - Gas Pressure Test Passed
02/07/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/20/2024 COT - RSBU - Interior Shear Bracing Passed
04/03/2024 COT - BULD - SWG Clearance Passed
04/30/2024 COT - RSEL - Electrical Final Passed
04/30/2024 COT - RSEL - Outdoor Lighting Passed
04/30/2024 COT - RSPL - Plumbing Final Passed
04/30/2024 ENGR Engineering Final Passed
04/30/2024 RSBU - Building Progress Passed
05/16/2024 COT - RSME - Mechanical Final Passed
05/16/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
143913 PT LOT 115 COMPLETE-2024-02-27_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 115 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 115 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 115 SPECIAL INSPECTION CERTIFICATE-2023-09-08_V1.PDF DOCUMENTS VIEW