Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/12/2023
Applicant:
Daria Hopkins
Description:
SFR 130.1600 T21-M0030

Permit Reviews

Permit Number - TC-MDP-0523-00995
Permit Status: Complete
Permit Description: SFR 130.1600 T21-M0030
Start Date Submittal Complete Date Status  
05/18/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 05/30/2023 APPROVED Review Details
07/22/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/24/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0523-00995
Permit Status: Complete
Permit Description: SFR 130.1600 T21-M0030
Date Description Comments
05/18/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/18/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/24/2024 Post-Tension Inspection Report is required.
05/11/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/24/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/18/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/30/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-00995
Permite Description: SFR 130.1600 T21-M0030
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/01/2023 COT - RSPL - Rough Soil N/A Re-inspection required Rocky soil conditions. Expose all joints.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-00995
Permit Description: SFR 130.1600 T21-M0030
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/01/2023 COT - RSPL - Sewer Passed
08/04/2023 COT - RSPL - Rough Soil Passed
08/07/2023 COT - RSPL - Yard Water Line Passed
08/17/2023 COT - RSBU - Preslab Passed
08/17/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/17/2023 COT - RSEL - Electrical Underground Passed
08/17/2023 COT - RSEL - Grounding/Bonding Passed
08/28/2023 COT - RSBU - Roof Nailing Passed
08/31/2023 COT - RSBU - Exterior Clips/Sheathing Passed
10/12/2023 BULD - Electrical Clearance Passed
10/12/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/12/2023 COT - RSPL - Gas Pressure Test Passed
11/02/2023 COT - RSBU - Interior Shear Bracing Passed
12/20/2023 COT - BULD - SWG Clearance Passed
01/17/2024 COT - RSEL - Electrical Final Passed
01/17/2024 COT - RSEL - Outdoor Lighting Passed
01/17/2024 COT - RSME - Mechanical Final Passed
01/17/2024 COT - RSPL - Plumbing Final Passed
01/17/2024 RSBU - Building Final Passed
01/17/2024 RSBU - Building Progress Passed
01/17/2024 ENGR Engineering Final Passed Gate needs to be installed.
HOA will ensure that common area is completed.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 173 FINAL SPECIAL INSPECTION CERTIFICATE-2024-07-19_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 173 SPECIAL INSPECTION CERTIFICATE-2023-05-12_V1.PDF DOCUMENTS VIEW
LOT 173 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 173 PLOT PLAN_V1.PDF DOCUMENTS VIEW