Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/11/2023
Applicant:
Andrea Flood
Description:
SFR STF40K T20-M0039 Revision Truss Calcs

Permit Reviews

Permit Number - TC-MDP-0523-00990
Permit Status: Complete
Permit Description: SFR STF40K T20-M0039 Revision Truss Calcs
Start Date Submittal Complete Date Status  
05/16/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 05/17/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-00990
Permit Status: Complete
Permit Description: SFR STF40K T20-M0039 Revision Truss Calcs
Total Outstanding Activity Conditions - 8
Date Name
05/16/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
05/16/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/16/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/16/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/16/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/16/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
07/20/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/20/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0523-00990
Permit Status: Complete
Permit Description: SFR STF40K T20-M0039 Revision Truss Calcs
Date Description Comments
05/17/2023 Separate submittal to PC RWRD is required to be paid in full for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-00990
Permit Description: SFR STF40K T20-M0039 Revision Truss Calcs
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/26/2023 COT - RSPL - Rough Soil Passed
06/02/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
06/02/2023 COT - RSBU - Preslab Passed
06/02/2023 COT - RSEL - Electrical Underground Passed
06/15/2023 COT - RSPL - Yard Water Line Passed
06/20/2023 COT - RSBU - Exterior Clips/Sheathing Passed Passed, will check missing anchor bolts (marked in red) at intermediate
06/20/2023 COT - RSBU - Interior Shear Bracing Passed Passed, will check missing anchor bolts (marked in red) at intermediate
06/20/2023 COT - RSBU - Roof Nailing Passed Passed, will check missing anchor bolts (marked in red) at intermediate
06/29/2023 COT - RSPL - Sewer Passed
06/30/2023 BULD - Electrical Clearance Passed
07/21/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/21/2023 COT - RSEL - Grounding/Bonding Passed
07/21/2023 COT - RSPL - Gas Pressure Test Passed
09/13/2023 COT - BULD - SWG Clearance Passed SWG clearance issued.
10/09/2023 COT - RSEL - Electrical Final Passed
10/09/2023 COT - RSEL - Outdoor Lighting Passed
10/09/2023 COT - RSME - Mechanical Final Passed
10/09/2023 COT - RSPL - Plumbing Final Passed
10/09/2023 RSBU - Building Final Passed
10/09/2023 RSBU - Building Progress Passed
10/09/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-05-11_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW