Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/22/2023
Applicant:
Celina Rodriguez
Description:
SFR BT1740-130 T22-M0015

Permit Reviews

Permit Number - TC-MDP-0523-00988
Permit Status: Complete
Permit Description: SFR BT1740-130 T22-M0015
Start Date Submittal Complete Date Status  
06/28/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 06/30/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-00988
Permit Status: Complete
Permit Description: SFR BT1740-130 T22-M0015
Total Outstanding Activity Conditions - 4
Date Name
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/28/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/28/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/30/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0523-00988
Permit Status: Complete
Permit Description: SFR BT1740-130 T22-M0015
Date Description Comments
05/10/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/28/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-00988
Permit Description: SFR BT1740-130 T22-M0015
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/24/2023 COT - RSPL - Yard Water Line Passed
07/24/2023 COT - RSPL - Rough Soil Passed
07/24/2023 COT - RSPL - Sewer Passed
08/07/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/07/2023 COT - RSBU - Preslab Passed
08/07/2023 COT - RSEL - Grounding/Bonding Passed
08/07/2023 COT - RSEL - Electrical Underground Passed
08/18/2023 COT - RSBU - Roof Nailing Passed
08/22/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/25/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/26/2023 COT - RSPL - Gas Pressure Test Passed
10/12/2023 COT - RSBU - Interior Shear Bracing Passed
10/24/2023 BULD - Electrical Clearance Passed 11/30/23 clearance resent
12/11/23 clearance resent
11/29/2023 COT - BULD - SWG Clearance Passed Okay to install meter and turn on gas.
01/03/2024 COT - RSEL - Electrical Final Passed
01/03/2024 COT - RSEL - Outdoor Lighting Passed
01/03/2024 COT - RSME - Mechanical Final Passed
01/03/2024 COT - RSPL - Plumbing Final Passed
01/03/2024 RSBU - Building Final Passed
01/03/2024 RSBU - Building Progress Passed
01/03/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA II 67 SIC-2023-06-22_V1.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 2- LOT 67 START_V1.PDF DOCUMENTS VIEW
P21WP00207 FINAL ACCEPTANCE BTII_V1.PDF DOCUMENTS VIEW