Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0523-00984
Permit Details
Apply Date:
08/09/2023
Applicant:
Description:
VC 1465-130
Permit Reviews
Permit Number - TC-MDP-0523-00984
Permit Status: Inspections complete
Permit Description: VC 1465-130
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/09/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 08/21/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0523-00984
Permit Status: Inspections complete
Permit Description: VC 1465-130
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
04/03/2023 | Post-Tension Inspection Report is required. |
04/03/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
08/09/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
08/09/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
08/11/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
08/18/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0523-00984
Permit Status: Inspections complete
Permit Description: VC 1465-130
Date | Description | Comments |
---|---|---|
05/09/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0523-00984
Permit Description: VC 1465-130
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/01/2023 | COT - RSPL - Rough Soil | Passed | ||
09/01/2023 | COT - RSPL - Backwater Valve | Passed | ||
09/01/2023 | COT - RSPL - Sewer | Passed | ||
09/01/2023 | COT - RSPL - Yard Water Line | Passed | ||
09/15/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 9/15/23 Side yard setback calls for 10 ft about 1 inch and a half short talked to manager Dave | |
09/15/2023 | COT - RSBU - Preslab | Passed | 9/15/23 Side yard setback calls for 10 ft about 1 inch and a half short talked to manager Dave | |
09/15/2023 | COT - RSEL - Electrical Underground | Passed | 9/15/23 Side yard setback calls for 10 ft about 1 inch and a half short talked to manager Dave | |
09/15/2023 | COT - RSEL - Grounding/Bonding | Passed | 9/15/23 Side yard setback calls for 10 ft about 1 inch and a half short talked to manager Dave | |
09/29/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
09/29/2023 | COT - RSBU - Roof Nailing | Passed | ||
10/19/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
10/19/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
10/20/2023 | RSBU - Building Progress | Passed | ||
10/20/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 10/20/2023 | |
10/26/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
12/13/2023 | COT - BULD - SWG Clearance | Passed | ||
01/09/2024 | COT - RSEL - Electrical Final | Passed | ||
01/09/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
01/09/2024 | COT - RSME - Mechanical Final | Passed | ||
01/09/2024 | ENGR Engineering Final | Passed | ||
01/19/2024 | COT - RSPL - Plumbing Final | Passed | ||
01/19/2024 | RSBU - Building Final | Passed |