Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
08/14/2023
Applicant:
Description:
VC 1465-130

Permit Reviews

Permit Number - TC-MDP-0523-00983
Permit Status: Complete
Permit Description: VC 1465-130
Start Date Submittal Complete Date Status  
08/15/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 08/16/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-00983
Permit Status: Complete
Permit Description: VC 1465-130
Total Outstanding Activity Conditions - 7
Date Name
04/03/2023 Post-Tension Inspection Report is required.
04/03/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
08/11/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/15/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/15/2023 A building permit is required for the retaining wall prior to finalization
08/15/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/16/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Conditions

Permit Number - TC-MDP-0523-00983
Permit Status: Complete
Permit Description: VC 1465-130
Date Description Comments
08/11/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-00983
Permit Description: VC 1465-130
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/13/2023 COT - RSPL - Yard Water Line Passed
09/13/2023 COT - RSPL - Rough Soil Passed
09/13/2023 COT - RSPL - Sewer Passed
09/21/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/21/2023 COT - RSBU - Preslab Passed
09/21/2023 COT - RSEL - Electrical Underground Passed
09/21/2023 COT - RSEL - Grounding/Bonding Passed
10/10/2023 COT - RSBU - Roof Nailing Passed
10/12/2023 COT - RSBU - Exterior Clips/Sheathing Passed
10/27/2023 COT - RSPL - Gas Pressure Test Passed
10/27/2023 BULD - Electrical Clearance Passed
10/30/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/06/2023 COT - RSBU - Interior Shear Bracing Passed
12/18/2023 COT - BULD - SWG Clearance Passed Gas valves are installed for stove and water heater. Okay to install meter and connect gas to house.
01/09/2024 COT - RSEL - Electrical Final Passed
01/09/2024 COT - RSEL - Outdoor Lighting Passed
01/09/2024 COT - RSME - Mechanical Final Passed
01/09/2024 COT - RSPL - Plumbing Final Passed
01/09/2024 RSBU - Building Final Passed
01/09/2024 RSBU - Building Progress Passed
01/09/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
VALENCIA CROSSING - LOT 31 START_V1.PDF DOCUMENTS VIEW
VC 31 SIC-2023-08-14_V1.PDF DOCUMENTS VIEW