Permit: TC-MDP-0523-00982
Permit Details
Apply Date:
09/12/2023
Applicant:
Description:
VC 1465-130
Permit Reviews
Permit Number - TC-MDP-0523-00982
Permit Status: Inspections complete
Permit Description: VC 1465-130
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/13/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/18/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0523-00982
Permit Status: Inspections complete
Permit Description: VC 1465-130
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
04/03/2023 | Post-Tension Inspection Report is required. |
04/03/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
08/11/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
09/13/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
09/13/2023 | Post-Installed Anchor Inspection Report is required. |
09/13/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
09/14/2023 | A building permit is required for the retaining wall prior to finalization. |
Conditions
Permit Number - TC-MDP-0523-00982
Permit Status: Inspections complete
Permit Description: VC 1465-130
Date | Description | Comments |
---|---|---|
09/20/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
05/09/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0523-00982
Permite Description: VC 1465-130
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/23/2023 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | Not ready. |
10/23/2023 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | Missing anchor bolts at perimeter and shear walls, missing plans, not ready. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0523-00982
Permit Description: VC 1465-130
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/03/2023 | COT - RSPL - Rough Soil | Passed | ||
10/03/2023 | COT - RSPL - Sewer | Passed | ||
10/03/2023 | COT - RSPL - Yard Water Line | Passed | ||
10/06/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
10/06/2023 | COT - RSBU - Preslab | Passed | ||
10/06/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
10/06/2023 | COT - RSEL - Electrical Underground | Passed | ||
10/30/2023 | COT - RSBU - Roof Nailing | Passed | ||
11/21/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/21/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
11/21/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
11/28/2023 | BULD - Electrical Clearance | Passed | ||
12/01/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
01/12/2024 | COT - BULD - SWG Clearance | Passed | ||
01/31/2024 | COT - RSEL - Electrical Final | Passed | Electrical panel is properly labeled, all electrical fixtures and outlets are installed and operational, and AFCI breakers & GFCI outlets are installed as required. Exterior lights are installed and operational per plans. | |
01/31/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is installed per plans and operational. | |
01/31/2024 | COT - RSME - Mechanical Final | Passed | Mechanical equipment is installed and operational. Supply and return registers are in place. Thermostat is installed and functioning properly. All bedroom doors are under cut for air movement. | |
01/31/2024 | COT - RSPL - Plumbing Final | Passed | All plumbing fixtures are installed and operational. Exterior hose bibs are anti-siphon type bibs. Gas lines are properly connected to appliances. On demand water heater is installed and set for 120 degrees. | |
01/31/2024 | RSBU - Building Final | Passed | Construction is complete. Okay to issue Certificate of Occupancy, once all other departments approve construction. | |
01/31/2024 | RSBU - Building Progress | Passed | Construction is complete. | |
01/31/2024 | ENGR Engineering Final | Passed | Cut the clean out pipes down to grade. |