Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
05/09/2023
Applicant:
Description:
VC 1465-130 Convert Garage to Sales Office

Permit Reviews

Permit Number - TC-MDP-0523-00980
Permit Status: Issued
Permit Description: VC 1465-130 Convert Garage to Sales Office
Start Date Submittal Complete Date Status  
06/08/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 06/28/2023 APPROVED Review Details
05/12/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 05/16/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-00980
Permit Status: Issued
Permit Description: VC 1465-130 Convert Garage to Sales Office
Total Outstanding Activity Conditions - 4
Date Name
04/03/2023 Post-Tension Inspection Report is required.
04/03/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
08/11/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/11/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0523-00980
Permit Status: Issued
Permit Description: VC 1465-130 Convert Garage to Sales Office
Date Description Comments
05/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0523-00980
Permite Description: VC 1465-130 Convert Garage to Sales Office
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
07/31/2023 RSBU - Building Final N/A Re-inspection required 7/31/23: generator needs grounding
07/31/2023 RSBU - Building Progress N/A Re-inspection required 7/31/23: generator needs grounding
07/31/2023 COT - RSPL - Plumbing Final N/A Re-inspection required 7/31/23: generator needs grounding
07/31/2023 COT - RSME - Mechanical Final N/A Re-inspection required 7/31/23: generator needs grounding
07/31/2023 COT - RSEL - Outdoor Lighting N/A Re-inspection required 7/31/23: generator needs grounding
07/31/2023 COT - RSEL - Electrical Final N/A Re-inspection required 7/31/23: generator needs grounding
08/02/2023 COT - BULD - SWG Clearance N/A Not Applicable
11/07/2023 BULD - Electrical Clearance N/A Canceled Canceled per contractor. 11/7/2023
12/03/2024 ENGR Engineering Final N/A Failed This home is now lived in, how did they get the CO without completing the Engineering inspection???

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0523-00980
Permit Description: VC 1465-130 Convert Garage to Sales Office
Total Completed Inspections - 19
Date Description Inspector Results Comments
05/19/2023 COT - RSPL - Yard Water Line Passed
05/19/2023 COT - RSPL - Rough Soil Passed
05/23/2023 COT - RSBU - Preslab Passed
05/23/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
05/23/2023 COT - RSEL - Electrical Underground Passed
05/23/2023 COT - RSEL - Grounding/Bonding Passed
05/30/2023 COT - RSBU - Exterior Clips/Sheathing Passed
06/05/2023 COT - RSBU - Roof Nailing Passed
06/07/2023 COT - RSPL - Gas Pressure Test Passed
06/08/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/12/2023 COT - RSBU - Interior Shear Bracing Passed
07/14/2023 COT - RSPL - Sewer Passed
08/02/2023 RSBU - Building Final Passed
08/02/2023 RSBU - Building Progress Passed
08/02/2023 COT - RSPL - Plumbing Final Passed
08/02/2023 COT - RSME - Mechanical Final Passed
08/02/2023 COT - RSEL - Outdoor Lighting Passed
08/02/2023 COT - RSEL - Electrical Final Passed
11/08/2023 BULD - Electrical Clearance Passed 11/8/23: Electrical panel is properly labeled, ground is attached to Ufer ground and address label is attached to meter box below meter socket. Level ECO clearance issued for building. Okay to energize electrical panel.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REV1_PLAN SET_V1.PDF DOCUMENTS VIEW
REV_REV NARRATIVE_V1.PDF DOCUMENTS VIEW
REV1_MECH LOADS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
VALENCIA CROSSING - LOT 3 START_V1.PDF DOCUMENTS VIEW