Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
1832 S POETRY LN
Apply Date:
05/17/2023
Applicant:
Mark Alteri
Description:
SFR CVPLAN3 T22-M0044

Permit Reviews

Permit Number - TC-MDP-0523-00977
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Start Date Submittal Complete Date Status  
10/16/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/17/2023 APPROVED Review Details
05/18/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 05/30/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0523-00977
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Date Description Comments
05/18/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/17/2023 Post-Tension Inspection Report is required.
05/05/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/30/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-00977
Permit Description: SFR CVPLAN3 T22-M0044
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/16/2023 COT - RSPL - Rough Soil Passed
06/16/2023 COT - RSPL - Sewer Passed
06/16/2023 COT - RSPL - Yard Water Line Passed
06/21/2023 COT - RSBU - Preslab Passed
06/21/2023 COT - RSEL - Electrical Underground Passed
06/21/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
06/21/2023 COT - RSEL - Grounding/Bonding Passed
08/04/2023 COT - RSBU - Roof Nailing Passed
08/04/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/05/2023 BULD - Electrical Clearance Passed Approved new service, ECO Clearance to TEP is required
11/07/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/07/2023 COT - RSPL - Gas Pressure Test Passed
12/04/2023 COT - RSBU - Interior Shear Bracing Passed
02/06/2024 COT - BULD - SWG Clearance Passed Swg for meter only
02/06/2024 COT - RSEL - Electrical Final Passed
02/06/2024 COT - RSEL - Outdoor Lighting Passed
02/06/2024 COT - RSME - Mechanical Final Passed
02/06/2024 COT - RSPL - Plumbing Final Passed
02/06/2024 RSBU - Building Final Passed
02/06/2024 RSBU - Building Progress Passed
02/06/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
PT REPORT LOT 33-2023-10-16_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 33 PP FOR PERMIT_V1.PDF DOCUMENTS VIEW
CBT 33 PT CERT-2023-05-17_V1.PDF DOCUMENTS VIEW