Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address:
303 E NAVAJO RD
Address NEW:
303 E NAVAJO RD
Apply Date:
07/03/2023
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037 (Model master plan TC-MDP-0523-00969)

Permit Reviews

Permit Number - TC-MDP-0523-00971
Permit Status: Inspections complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037 (Model master plan TC-MDP-0523-00969)
Start Date Submittal Complete Date Status  
08/10/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/14/2023 APPROVED Review Details
11/28/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/28/2023 REQUIRES RESUBMIT Review Details
07/24/2023 RESTAMP - RESIDENTIAL v.1 07/25/2023 APPROVED Review Details
07/12/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.2 07/24/2023 APPROVED Review Details
07/05/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 07/12/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-00971
Permit Status: Inspections complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037 (Model master plan TC-MDP-0523-00969)
Total Outstanding Activity Conditions - 1
Date Name
04/25/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0523-00971
Permit Status: Inspections complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037 (Model master plan TC-MDP-0523-00969)
Date Description Comments
09/05/2023 This project is within a floodplain and requires an elevation certificate. Submission and Issuance of a Floodplain Use Permit (FUP) is required PRIOR TO ISSUANCE of this permit. An intermediate Elevation Certificate is required PRIOR TO GRADING and/or PRE-SLAB INSPECTION. Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit.
04/25/2025 Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit.
07/05/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/06/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0523-00971
Permite Description: DUPLEX DUPLVAL82 T22-M0037 (Model master plan TC-MDP-0523-00969)
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
09/08/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Canceled Cancelled due to Stop Work Order on project for flood plain issues. Ramon Valdez is aware of issue and working to correct elevation issues.
11/13/2025 BULD - Electrical Clearance N/A Not Applicable
11/13/2025 COT - BULD - SWG Clearance N/A Not Applicable
11/13/2025 COT - RSEL - Electrical Underground N/A Not Applicable
11/13/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
11/18/2025 ENGR Engineering Final N/A Not Ready Accessible Route per inclusive home design ordinance will need re-inspection after stem wall correction.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0523-00971
Permit Description: DUPLEX DUPLVAL82 T22-M0037 (Model master plan TC-MDP-0523-00969)
Total Completed Inspections - 18
Date Description Inspector Results Comments
08/23/2023 COT - RSBU - Preslab Passed Okay for concrete placement in footing and slab. 8/23/2023
07/31/2025 COT - RSPL - Rough Soil Passed
07/31/2025 COT - RSPL - Sewer Passed
07/31/2025 COT - RSPL - Yard Water Line Passed
08/01/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 8/1/25 ok to pour concrete
08/01/2025 COT - RSBU - Preslab and floodplain Passed Passed 8/1/25 ok to pour concrete
08/11/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
08/11/2025 COT - RSBU - Roof Nailing Passed
08/13/2025 COT - RSBU - Interior Shear Bracing Passed
08/13/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/13/2025 COT - RSEL - Electrical Final Passed
11/13/2025 COT - RSEL - Grounding/Bonding Passed
11/13/2025 COT - RSEL - Outdoor Lighting Passed
11/13/2025 COT - RSME - Mechanical Final Passed
11/13/2025 COT - RSPL - Plumbing Final Passed
11/13/2025 RSBU - Building Final Passed
11/13/2025 RSBU - Building Progress Passed
12/15/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-303ENAVAJORD SEWER SITE_V1.PDF DOCUMENTS VIEW
REVISION 303 NAVAJO_V1.PDF DOCUMENTS VIEW
303 E NAVAJO CORRECTION_V1.PDF DOCUMENTS VIEW