Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/16/2023
Applicant:
Andrea Flood
Description:
SFR F40G22 T22-M0025 Revision-Truss Calcs

Permit Reviews

Permit Number - TC-MDP-0523-00967
Permit Status: Complete
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Start Date Submittal Complete Date Status  
05/18/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 05/30/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-00967
Permit Status: Complete
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Total Outstanding Activity Conditions - 7
Date Name
05/18/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/18/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/18/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/18/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/30/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
07/20/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/20/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0523-00967
Permit Status: Complete
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Date Description Comments
05/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-00967
Permite Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/25/2023 COT - RSBU - Interior Shear Bracing N/A Not Ready 7/18/23: not ready
9/25/23: not ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-00967
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Total Completed Inspections - 19
Date Description Inspector Results Comments
06/22/2023 COT - RSPL - Yard Water Line Passed
06/22/2023 COT - RSPL - Rough Soil Passed
07/05/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
07/05/2023 COT - RSBU - Preslab Passed
07/05/2023 COT - RSEL - Electrical Underground Passed
07/13/2023 COT - RSPL - Sewer Passed
07/18/2023 COT - RSBU - Roof Nailing Passed
07/18/2023 COT - RSEL - Grounding/Bonding Passed
08/10/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/05/2023 COT - RSPL - Gas Pressure Test Passed
09/06/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/08/2023 COT - BULD - SWG Clearance Passed 11/8/23: SWG clearance issued.
12/13/2023 COT - RSEL - Electrical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Exterior hose bibs have anti siphon devices installed. Exterior lights are per plan. Okay to issue Certificate of Occupancy once all other parties have completed their final inspections.
12/13/2023 COT - RSEL - Outdoor Lighting Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Exterior hose bibs have anti siphon devices installed. Exterior lights are per plan. Okay to issue Certificate of Occupancy once all other parties have completed their final inspections.
12/13/2023 COT - RSME - Mechanical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Exterior hose bibs have anti siphon devices installed. Exterior lights are per plan. Okay to issue Certificate of Occupancy once all other parties have completed their final inspections.
12/13/2023 COT - RSPL - Plumbing Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Exterior hose bibs have anti siphon devices installed. Exterior lights are per plan. Okay to issue Certificate of Occupancy once all other parties have completed their final inspections.
12/13/2023 RSBU - Building Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Exterior hose bibs have anti siphon devices installed. Exterior lights are per plan. Okay to issue Certificate of Occupancy once all other parties have completed their final inspections.
12/13/2023 RSBU - Building Progress Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Exterior hose bibs have anti siphon devices installed. Exterior lights are per plan. Okay to issue Certificate of Occupancy once all other parties have completed their final inspections.
12/20/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-05-16_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW