Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0523-00967
Permit Details
Apply Date:
05/16/2023
Applicant:
Andrea Flood
Description:
SFR F40G22 T22-M0025 Revision-Truss Calcs
Permit Reviews
Permit Number - TC-MDP-0523-00967
Permit Status: Complete
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/18/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 05/30/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0523-00967
Permit Status: Complete
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
05/18/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
05/18/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
05/18/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
05/18/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
05/30/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
07/20/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/20/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0523-00967
Permit Status: Complete
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Date | Description | Comments |
---|---|---|
05/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-00967
Permite Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/25/2023 | COT - RSBU - Interior Shear Bracing | N/A | Not Ready | 7/18/23: not ready 9/25/23: not ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-00967
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/22/2023 | COT - RSPL - Yard Water Line | Passed | ||
06/22/2023 | COT - RSPL - Rough Soil | Passed | ||
07/05/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/05/2023 | COT - RSBU - Preslab | Passed | ||
07/05/2023 | COT - RSEL - Electrical Underground | Passed | ||
07/13/2023 | COT - RSPL - Sewer | Passed | ||
07/18/2023 | COT - RSBU - Roof Nailing | Passed | ||
07/18/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
08/10/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
09/05/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
09/06/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
11/08/2023 | COT - BULD - SWG Clearance | Passed | 11/8/23: SWG clearance issued. | |
12/13/2023 | COT - RSEL - Electrical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Exterior hose bibs have anti siphon devices installed. Exterior lights are per plan. Okay to issue Certificate of Occupancy once all other parties have completed their final inspections. | |
12/13/2023 | COT - RSEL - Outdoor Lighting | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Exterior hose bibs have anti siphon devices installed. Exterior lights are per plan. Okay to issue Certificate of Occupancy once all other parties have completed their final inspections. | |
12/13/2023 | COT - RSME - Mechanical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Exterior hose bibs have anti siphon devices installed. Exterior lights are per plan. Okay to issue Certificate of Occupancy once all other parties have completed their final inspections. | |
12/13/2023 | COT - RSPL - Plumbing Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Exterior hose bibs have anti siphon devices installed. Exterior lights are per plan. Okay to issue Certificate of Occupancy once all other parties have completed their final inspections. | |
12/13/2023 | RSBU - Building Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Exterior hose bibs have anti siphon devices installed. Exterior lights are per plan. Okay to issue Certificate of Occupancy once all other parties have completed their final inspections. | |
12/13/2023 | RSBU - Building Progress | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Exterior hose bibs have anti siphon devices installed. Exterior lights are per plan. Okay to issue Certificate of Occupancy once all other parties have completed their final inspections. | |
12/20/2023 | ENGR Engineering Final | Passed |