Permit: TC-MDP-0523-00962
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
10150 S ARNOLD RANCH CT
Address NEW:
10150 S ARNOLD RANCH CT
Apply Date:
05/04/2023
Applicant:
Andrea Flood
Description:
SFR RKK35L T21-M0084 REVISION-Structural changes
Permit Reviews
Permit Number - TC-MDP-0523-00962
Permit Status: Inspections complete
Permit Description: SFR RKK35L T21-M0084 REVISION-Structural changes
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/12/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 05/17/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0523-00962
Permit Status: Inspections complete
Permit Description: SFR RKK35L T21-M0084 REVISION-Structural changes
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 09/30/2024 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
| 09/30/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 09/30/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 09/30/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 09/30/2024 | Post-Installed Anchor Inspection Report is required. |
| 09/30/2024 | Soils |
| 09/30/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0523-00962
Permite Description: SFR RKK35L T21-M0084 REVISION-Structural changes
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 11-13-24, add anchor bolt on east side of home, add shot pins throughout (marked areas) |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0523-00962
Permit Description: SFR RKK35L T21-M0084 REVISION-Structural changes
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2024 | COT - RSPL - Rough Soil | Passed | 10'22/24 PASS OK to backfill shading required. | |
| 10/22/2024 | COT - RSPL - Sewer | Passed | 10'22/24 PASS OK to backfill shading required. | |
| 10/22/2024 | COT - RSPL - Yard Water Line | Passed | 10'22/24 PASS OK to backfill shading required. | |
| 10/29/2024 | COT - RSEL - Electrical Underground | Passed | 10-29-24, approved. | |
| 10/29/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10-29-24, setbacks per approved plans. | |
| 10/29/2024 | COT - RSEL - Grounding/Bonding | Passed | 10-29-24, grounding/bonding per approved plans. | |
| 10/29/2024 | COT - RSBU - Preslab | Passed | 10-29-24, preslab verified per approved plans. Okay to pour concrete. | |
| 11/13/2024 | COT - RSBU - Roof Nailing | Passed | 11-13-24, roof nailing and truss calcs approved. | |
| 11/15/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 11-15-24, all items from previous inspection have been corrected. Okay to proceed with construction. | |
| 01/22/2025 | COT - RSPL - Gas Pressure Test | Passed | 1/22/25 pass | |
| 01/22/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1/22/25 pass | |
| 01/23/2025 | BULD - Electrical Clearance | Passed | 1/23/25 approval for TEP ECO | |
| 02/03/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed interior shear 2/3/25 | |
| 03/21/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 3/21/25 | |
| 04/15/2025 | COT - RSME - Mechanical Final | Passed | Passed final 4/15/25 | |
| 04/15/2025 | RSBU - Building Final | Passed | Passed final 4/15/25 | |
| 04/15/2025 | ENGR Engineering Final | Passed | ||
| 04/15/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 4/15/25 | |
| 04/15/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 4/15/25 | |
| 04/15/2025 | RSBU - Building Progress | Passed | Passed final 4/15/25 | |
| 04/15/2025 | COT - RSEL - Electrical Final | Passed | Passed final 4/15/25 |