Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/04/2023
Applicant:
Daria Hopkins
Description:
SFR MERI213021 T21-M0065

Permit Reviews

Permit Number - TC-MDP-0523-00954
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Start Date Submittal Complete Date Status  
05/05/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 05/10/2023 APPROVED Review Details
04/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/12/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0523-00954
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Date Description Comments
05/10/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
05/05/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/05/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/12/2024 Post-Tension Inspection Report is required.
05/05/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/05/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/10/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-00954
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/12/2023 COT - RSPL - Rough Soil Passed 7/12/23: Passed per Gustavo.
07/12/2023 COT - RSPL - Sewer Passed 7/12/23: Passed per Gustavo.
07/12/2023 COT - RSPL - Yard Water Line Passed 7/12/23: Passed per Gustavo.
07/20/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
07/20/2023 COT - RSBU - Preslab Passed
07/20/2023 COT - RSEL - Electrical Underground Passed
07/20/2023 COT - RSEL - Grounding/Bonding Passed
08/04/2023 COT - RSBU - Exterior Clips/Sheathing Passed
08/04/2023 COT - RSBU - Roof Nailing Passed
09/01/2023 BULD - Electrical Clearance Passed Not ready.
9/1/23: TEP ECO CLEARANCE
09/01/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Nail plates needed at right side of garage, gas not under pressure, missing h2.5 clip at left side of garage, support duct registers on three sides and support exhaust in first floor restroom, add nail plate behind range vent, range wiring incomplete, nail plates needed at kitchen window, complete wiring in first floor ceiling throughout including front porch, complete vapor barrier and seal penetrations of vapor barrier at living room, open chase at bottom plate by living room, complete wiring going upstairs, dwv not under test, block register in laundry, fresh air intake to be 10’ away from vents. STOPPED INSPECTION. More items may be added.

9/1/23: all corrections made
09/01/2023 COT - RSPL - Gas Pressure Test Passed Not under pressure.

9/1/23: passed
09/21/2023 COT - RSBU - Interior Shear Bracing Passed
10/30/2023 COT - BULD - SWG Clearance Passed SWG for meter only
11/08/2023 COT - RSEL - Electrical Final Passed Building construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Okay to issue Certificate of Occupancy.
11/08/2023 COT - RSME - Mechanical Final Passed Building construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Okay to issue Certificate of Occupancy.
11/08/2023 COT - RSPL - Plumbing Final Passed Building construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Okay to issue Certificate of Occupancy.
11/08/2023 RSBU - Building Final Passed Building construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Okay to issue Certificate of Occupancy.
04/09/2024 ENGR Engineering Final Passed Occupied home, could not enter rear yard to check grade.
1) Clean out pipes create a trip hazard and should be cut down to cap being level with top of sidewalk or just below.
2) Looks to be a hump in the left side of home in grade that could create issues with drainage.
04/09/2024 RSBU - Building Progress Passed
04/09/2024 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 37 FINAL SPECIAL INSPECTION CERTIFICATE-2024-04-09_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 37 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 37 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 37 SPECIAL INSPECTION CERTIFICATE-2023-05-05_V1.PDF DOCUMENTS VIEW