Permit: TC-MDP-0523-00954
Permit Details
Apply Date:
05/04/2023
Applicant:
Daria Hopkins
Description:
SFR MERI213021 T21-M0065
Permit Reviews
Permit Number - TC-MDP-0523-00954
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/05/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 05/10/2023 | APPROVED |
04/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/12/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-00954
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Date | Description | Comments |
---|---|---|
05/10/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
05/05/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
05/05/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/12/2024 | Post-Tension Inspection Report is required. | |
05/05/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
05/05/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
05/10/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-00954
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/12/2023 | COT - RSPL - Rough Soil | Passed | 7/12/23: Passed per Gustavo. | |
07/12/2023 | COT - RSPL - Sewer | Passed | 7/12/23: Passed per Gustavo. | |
07/12/2023 | COT - RSPL - Yard Water Line | Passed | 7/12/23: Passed per Gustavo. | |
07/20/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/20/2023 | COT - RSBU - Preslab | Passed | ||
07/20/2023 | COT - RSEL - Electrical Underground | Passed | ||
07/20/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
08/04/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
08/04/2023 | COT - RSBU - Roof Nailing | Passed | ||
09/01/2023 | BULD - Electrical Clearance | Passed | Not ready. 9/1/23: TEP ECO CLEARANCE |
|
09/01/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Nail plates needed at right side of garage, gas not under pressure, missing h2.5 clip at left side of garage, support duct registers on three sides and support exhaust in first floor restroom, add nail plate behind range vent, range wiring incomplete, nail plates needed at kitchen window, complete wiring in first floor ceiling throughout including front porch, complete vapor barrier and seal penetrations of vapor barrier at living room, open chase at bottom plate by living room, complete wiring going upstairs, dwv not under test, block register in laundry, fresh air intake to be 10’ away from vents. STOPPED INSPECTION. More items may be added. 9/1/23: all corrections made |
|
09/01/2023 | COT - RSPL - Gas Pressure Test | Passed | Not under pressure. 9/1/23: passed |
|
09/21/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
10/30/2023 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
11/08/2023 | COT - RSEL - Electrical Final | Passed | Building construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Okay to issue Certificate of Occupancy. | |
11/08/2023 | COT - RSME - Mechanical Final | Passed | Building construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Okay to issue Certificate of Occupancy. | |
11/08/2023 | COT - RSPL - Plumbing Final | Passed | Building construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Okay to issue Certificate of Occupancy. | |
11/08/2023 | RSBU - Building Final | Passed | Building construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. Okay to issue Certificate of Occupancy. | |
04/09/2024 | ENGR Engineering Final | Passed | Occupied home, could not enter rear yard to check grade. 1) Clean out pipes create a trip hazard and should be cut down to cap being level with top of sidewalk or just below. 2) Looks to be a hump in the left side of home in grade that could create issues with drainage. |
|
04/09/2024 | RSBU - Building Progress | Passed | ||
04/09/2024 | COT - RSEL - Outdoor Lighting | Passed |