Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/18/2023
Applicant:
David Martin
Description:
SFR K35O T21-M0036

Permit Reviews

Permit Number - TC-MDP-0523-00952
Permit Status: Complete
Permit Description: SFR K35O T21-M0036
Start Date Submittal Complete Date Status  
11/01/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/03/2023 APPROVED Review Details
05/22/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 06/05/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0523-00952
Permit Status: Complete
Permit Description: SFR K35O T21-M0036
Date Description Comments
05/22/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/17/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/03/2023 Post-Tension Inspection Report is required.
05/22/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County
01/17/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-00952
Permit Description: SFR K35O T21-M0036
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/06/2023 COT - RSPL - Rough Soil Passed
07/06/2023 COT - RSPL - Yard Water Line Passed
07/06/2023 COT - RSPL - Sewer Passed
07/14/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
07/14/2023 COT - RSBU - Preslab Passed
07/14/2023 COT - RSEL - Electrical Underground Passed
07/14/2023 COT - RSEL - Grounding/Bonding Passed
08/16/2023 COT - RSBU - Roof Nailing Passed
08/18/2023 COT - RSBU - Exterior Clips/Sheathing Passed Corrections were made. 8/18/2023
09/15/2023 BULD - Electrical Clearance Passed Clearance for TEP ECO. 9/15/2023
09/15/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/15/2023 COT - RSPL - Gas Pressure Test Passed
09/26/2023 COT - RSBU - Interior Shear Bracing Passed
11/20/2023 COT - BULD - SWG Clearance Passed Approved, SWG Clearance is required for the new service
12/12/2023 COT - RSEL - Outdoor Lighting Passed
12/12/2023 RSBU - Building Progress Passed
12/12/2023 ENGR Engineering Final Passed
12/14/2023 COT - RSEL - Electrical Final Passed
12/14/2023 COT - RSME - Mechanical Final Passed
12/14/2023 COT - RSPL - Plumbing Final Passed
12/14/2023 RSBU - Building Final Passed

Documents

File Name Document Type  
210841 - WESTBRIDGE AT SILVERBELL LOT 56 - PT REPORT-2023-11-01_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-05-18_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW