Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0523-00951
Permit Details
Apply Date:
05/09/2023
Applicant:
David Martin
Description:
SFR K35O T21-M0036
Permit Reviews
Permit Number - TC-MDP-0523-00951
Permit Status: Complete
Permit Description: SFR K35O T21-M0036
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/11/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 05/16/2023 | APPROVED |
11/01/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/02/2023 | REQUIRES RESUBMIT |
10/18/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/23/2023 | APPROVED |
11/08/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 11/13/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-00951
Permit Status: Complete
Permit Description: SFR K35O T21-M0036
Date | Description | Comments |
---|---|---|
05/15/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
05/15/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/17/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/15/2023 | Post-Installed Anchor Inspection Report is required. | |
10/23/2023 | Post-Tension Inspection Report is required. | |
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/15/2023 | Sewer condition must be accepted and released by Pima County | |
01/17/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-00951
Permite Description: SFR K35O T21-M0036
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/25/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Partial pass. Replace fresh air intake due to water being trapped. Add blocking around Chasse and tub for draft stop. 8/25/2023 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-00951
Permit Description: SFR K35O T21-M0036
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/12/2023 | COT - RSPL - Backwater Valve | Passed | Okay to backfill. Shading required. 6/12/2023 | |
06/12/2023 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 6/12/2023 | |
06/12/2023 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 6/12/2023 | |
06/12/2023 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 6/12/2023 | |
06/21/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/21/2023 | COT - RSBU - Preslab | Passed | ||
06/21/2023 | COT - RSEL - Electrical Underground | Passed | ||
06/21/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
07/19/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/19/2023 | COT - RSBU - Roof Nailing | Passed | ||
08/25/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 8/25/2023 | |
08/24/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
08/28/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved. Corrections were made. 8/28/2023 | |
09/01/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
10/23/2023 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 10/23/2023 | |
10/27/2023 | COT - RSEL - Electrical Final | Passed | ||
10/27/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
10/27/2023 | COT - RSME - Mechanical Final | Passed | ||
10/27/2023 | COT - RSPL - Plumbing Final | Passed | ||
10/27/2023 | RSBU - Building Progress | Passed | ||
10/27/2023 | ENGR Engineering Final | Passed | ||
11/01/2023 | RSBU - Building Final | Passed |