Permit: TC-MDP-0426-00252
Permit Details
Status:
Fees Due
Type:
Model Building Permit
Address:
1208 E LIGGINS ST
Address NEW:
1208 E LIGGINS ST
Apply Date:
04/22/2026
Applicant:
Mark Alteri
Description:
PV 1520 SFR (Model master plan TC-MDP-0124-00024) Rev. 1
Permit Reviews
Permit Number - TC-MDP-0426-00252
Permit Status: Fees due
Permit Description: PV 1520 SFR (Model master plan TC-MDP-0124-00024) Rev. 1
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/04/2026 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/08/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0426-00252
Permit Status: Fees due
Permit Description: PV 1520 SFR (Model master plan TC-MDP-0124-00024) Rev. 1
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/23/2026 | Post-Tension Inspection Report is required. |
| 05/05/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0426-00252
Permit Status: Fees due
Permit Description: PV 1520 SFR (Model master plan TC-MDP-0124-00024) Rev. 1
| Date | Description | Comments |
|---|---|---|
| 05/04/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 04/23/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 04/23/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |