Permit Details

Status:
Inspections
Type:
Model Building Permit
Address NEW:
9630 E FRIEDEL DR
Apply Date:
08/05/2025
Applicant:
Joshua Swinney
Description:
Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)

Permit Reviews

Permit Number - TC-MDP-0425-00275
Permit Status: Inspections
Permit Description: Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)
Start Date Submittal Complete Date Status  
08/15/2025 SITE FROM MODEL PERMIT - PRODUCTION v.2 08/15/2025 REQUIRES RESUBMIT Review Details
08/15/2025 RESTAMP - RESIDENTIAL v.1 08/18/2025 APPROVED Review Details
08/06/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/14/2025 REQUIRES RESUBMIT Review Details
08/15/2025 SITE FROM MODEL PERMIT - PRODUCTION v.3 08/15/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0425-00275
Permit Status: Inspections
Permit Description: Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)
Total Outstanding Activity Conditions - 4
Date Name
04/30/2025 Post-Tension Inspection Report is required.
04/30/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
08/07/2025 Post-Installed Anchor Inspection Report is required.
08/07/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0425-00275
Permit Status: Inspections
Permit Description: Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)
Date Description Comments
08/06/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
04/30/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0425-00275
Permite Description: Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/10/2025 COT - BULD - SWG Clearance N/A Not Applicable
12/05/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0425-00275
Permit Description: Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)
Total Completed Inspections - 12
Date Description Inspector Results Comments
09/10/2025 COT - RSPL - Sewer Passed 9.10.25
APPROVED
09/10/2025 COT - RSPL - Yard Water Line Passed 9.10.25
APPROVED
09/18/2025 COT - RSPL - Rough Soil Passed
09/18/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
09/18/2025 COT - RSBU - Preslab Passed 9.18.2025
Okay for concrete placement.
09/18/2025 COT - RSEL - Electrical Underground Passed
10/10/2025 COT - RSBU - Roof Nailing Passed
12/05/2025 BULD - Electrical Clearance Passed 12.5.25
Approved for eco
12/05/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 12.5.25
Approved
12/05/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/05/2025 COT - RSEL - Grounding/Bonding Passed 12.5.25
Approved
12/18/2025 COT - RSBU - Interior Shear Bracing Passed Passed 12/18/25

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LA ESCALERA (MIRADOR) LOT 100_V2.PDF DOCUMENTS VIEW
PHASE 1A LOT 100 SIC-2025-08-05_V1.PDF DOCUMENTS VIEW