Permit: TC-MDP-0425-00265
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
5918 E JAYDEN LN
Address NEW:
5918 E JAYDEN LN
Apply Date:
06/04/2025
Applicant:
Candis Benson
Description:
Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Permit Reviews
Permit Number - TC-MDP-0425-00265
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/01/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 07/01/2025 | REQUIRES RESUBMIT |
| 07/03/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.3 | 07/10/2025 | APPROVED |
| 06/06/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 06/06/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0425-00265
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/28/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 07/08/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 07/08/2025 | Post-Installed Anchor Inspection Report is required. |
| 07/08/2025 | Post-Tension Inspection Report is required. |
| 07/08/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0425-00265
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
| Date | Description | Comments |
|---|---|---|
| 04/28/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0425-00265
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2025 | COT - RSPL - Backwater Valve | Passed | Okay to backfill. Shading material is required. 8/7/2025 | |
| 08/07/2025 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading material is required. 8/7/2025 | |
| 08/07/2025 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading material is required. 8/7/2025 | |
| 08/07/2025 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading material is required. 8/7/2025 | |
| 08/13/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/13/2025 | COT - RSBU - Preslab | Passed | ||
| 08/13/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 08/25/2025 | BULD - Electrical Clearance | Passed | 8/25/25 TEP CLEARANCE:ECO. |
|
| 09/04/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 9.4.2025 Contractor corrected prior inspection 8.26.2025 and provided engineer letters for trusses and web plate repair. |
|
| 09/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 09/04/2025 | COT - RSBU - Roof Nailing | Passed | 9.4.2025 Contractor corrected prior inspection 8.26.2025 and provided engineer letters for trusses and web plate repair. |
|
| 09/04/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/04/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 09/11/2025 | COT - RSBU - Interior Shear Bracing | Passed | 9.11.25 Approved |
|
| 10/15/2025 | COT - BULD - SWG Clearance | Passed | ||
| 10/21/2025 | COT - RSEL - Electrical Final | Passed | Passed final 10/21/25 | |
| 10/21/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 10/21/25 | |
| 10/21/2025 | COT - RSME - Mechanical Final | Passed | Passed final 10/21/25 | |
| 10/21/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 10/21/25 | |
| 10/21/2025 | RSBU - Building Final | Passed | Passed final 10/21/25 | |
| 10/21/2025 | RSBU - Building Progress | Passed | Passed final 10/21/25 | |
| 10/22/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. Engineering is okay for CofO. |