Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address:
5912 E JAYDEN LN
Address NEW:
5912 E JAYDEN LN
Apply Date:
08/16/2025
Applicant:
Candis Benson
Description:
Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)

Permit Reviews

Permit Number - TC-MDP-0425-00264
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Start Date Submittal Complete Date Status  
08/18/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 08/25/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0425-00264
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Total Outstanding Activity Conditions - 5
Date Name
04/28/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/28/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
08/19/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/19/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/19/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0425-00264
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Date Description Comments
08/19/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
04/28/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0425-00264
Permite Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/11/2025 ENGR Engineering Final N/A Not Ready Drain weep holes at rear are elevated. Water will pool there. Water is also pooling at side yards.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0425-00264
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Total Completed Inspections - 22
Date Description Inspector Results Comments
09/12/2025 COT - RSPL - Backwater Valve Passed
09/12/2025 BULD - Electrical Clearance Passed 9.12.2025
Clearance for TEP ECO.
09/12/2025 COT - RSPL - Rough Soil Passed 9.12.2025
Verified trench depth, slope, under test, all fixtures. Okay to backfill, shading required.
09/12/2025 COT - RSPL - Sewer Passed 9.12.2025
Verified trench depth, slope, under test, green tracer wire. Okay to backfill, shading required.
09/12/2025 COT - RSPL - Yard Water Line Passed 9.12.2025
Verified trench depth, under test, and blue tracer wire. Okay to backfill, shading required.
09/18/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 9.18.25
APPROVED
09/18/2025 COT - RSBU - Preslab Passed 9.18.25
APPROVED
09/18/2025 COT - RSEL - Electrical Underground Passed 9.18.25
APPROVED
09/18/2025 COT - RSEL - Grounding/Bonding Passed 9.18.25
APPROVED
10/01/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/01/2025 COT - RSBU - Roof Nailing Passed
10/14/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/14/2025 COT - RSPL - Gas Pressure Test Passed
10/27/2025 COT - RSBU - Interior Shear Bracing Passed
12/03/2025 COT - BULD - SWG Clearance Passed
12/11/2025 COT - RSEL - Electrical Final Passed 12.11.25
Approved
12/11/2025 COT - RSEL - Outdoor Lighting Passed 12.11.25
Approved
12/11/2025 COT - RSME - Mechanical Final Passed 12.11.25
Approved
12/11/2025 COT - RSPL - Plumbing Final Passed 12.11.25
Approved
12/11/2025 RSBU - Building Final Passed 12.11.25
Approved
Corrections verified via photos
12/11/2025 RSBU - Building Progress Passed 12.11.25
Approved
12/12/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INPSECTION CERT-2025-08-16_V1.PDF DOCUMENTS VIEW