Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
5927 E BENBURB LN
Apply Date:
08/27/2025
Applicant:
Candis Benson
Description:
Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)

Permit Reviews

Permit Number - TC-MDP-0425-00263
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Start Date Submittal Complete Date Status  
08/28/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 09/04/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0425-00263
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Total Outstanding Activity Conditions - 4
Date Name
04/28/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
08/28/2025 Post-Installed Anchor Inspection Report is required.
08/28/2025 Post-Tension Inspection Report is required.
08/28/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0425-00263
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Date Description Comments
04/28/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0425-00263
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Total Completed Inspections - 22
Date Description Inspector Results Comments
09/23/2025 COT - RSPL - Rough Soil Passed
09/23/2025 COT - RSPL - Sewer Passed
09/23/2025 COT - RSPL - Yard Water Line Passed
09/23/2025 COT - RSPL - Backwater Valve Passed
09/29/2025 BULD - Electrical Clearance Passed 9.29.25
APPROVED
09/29/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 9.29.25
APPROVED
09/29/2025 COT - RSBU - Preslab Passed 9.29.25
APPROVED
09/29/2025 COT - RSEL - Electrical Underground Passed 9.29.25
APPROVED
09/29/2025 COT - RSEL - Grounding/Bonding Passed 9.29.25
APPROVED
10/08/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 10-8-25: exterior/interior clips & sheathing approved. Okay to continue with construction.
10/08/2025 COT - RSBU - Roof Nailing Passed 10-8-25: okay to dry-in roof.
10/23/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10.23.2025
Approved. Added support at water line behind tub, repaired damaged DWV pipe and no leaks under test.
10/23/2025 COT - RSPL - Gas Pressure Test Passed 10.23.2025
Approved and holding under test.
11/03/2025 COT - RSBU - Interior Shear Bracing Passed
12/12/2025 COT - BULD - SWG Clearance Passed 12.12.25
approved
12/17/2025 COT - RSEL - Electrical Final Passed
12/17/2025 COT - RSEL - Outdoor Lighting Passed
12/17/2025 COT - RSPL - Plumbing Final Passed
12/17/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
12/17/2025 RSBU - Building Progress Passed
12/18/2025 COT - RSME - Mechanical Final Passed 12/18/2025
Verified all appliances in place and gas meter set.
12/18/2025 RSBU - Building Final Passed 12/18/2025
Verified all appliances in place and gas meter set.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2025-08-27_V1.PDF DOCUMENTS VIEW