Permit: TC-MDP-0425-00248
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
5655 E 29TH ST BLDG 1 UNIT 1101
Address NEW:
5655 E 29TH ST BLDG 1 UNIT 1101
Apply Date:
09/15/2025
Applicant:
David Evans
Description:
Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Permit Reviews
Permit Number - TC-MDP-0425-00248
Permit Status: Complete
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/18/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/20/2026 | APPROVED |
| 09/16/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 10/02/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0425-00248
Permit Status: Complete
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
| Date | Description | Comments |
|---|---|---|
| 10/02/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 04/23/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/30/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0425-00248
Permite Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 10.23.25 Missing anchor bolts as marked Missing shot pins as marked |
| 11/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 1-Seal penetrations in Lath. 2-Seal hood penetration at top plate. 3-Strap condensation line. 4 Secure wiring away from gang nails. |
| 10/23/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Ready | Not ready |
| 10/23/2025 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 10.23.25 Improper fastener depth at sheathing (over penetration) |
| 01/29/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 01/29/2026 | COT - RSEL - Electrical Underground | N/A | Not Applicable | |
| 01/29/2026 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 01/29/2026 | RSBU - Building Final | N/A | Re-inspection required | Provide proper labeling on buildings along with numbers. Pending other inspections. 1/29/2026 |
| 01/29/2026 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | Provide shielded lighting. Facing downwards only fixtures. Throughout. 1/29/2026 |
| 12/16/2025 | ENGR Engineering Final | N/A | Failed | Site improvements under construction. Due to site construction being performed without inspection, a letter from the Engineer of Record accepting the work including compaction and paving will be required. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0425-00248
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2025 | COT - RSPL - Rough Soil | Passed | ||
| 10/08/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/08/2025 | COT - RSBU - Preslab | Passed | ||
| 10/08/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/27/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 10/27/2025 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 10/30/2025 | COT - RSPL - Sewer | Passed | ||
| 11/13/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 12/16/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 12/16/2025 | BULD - Electrical Clearance | Passed | 12/16/25 TEP CLEARANCE: ECO unit A/B |
|
| 12/16/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 01/22/2026 | COT - RSEL - Electrical Final | Passed | 1.22.26 Approved |
|
| 01/22/2026 | COT - RSME - Mechanical Final | Passed | 1.22.26 Approved |
|
| 01/22/2026 | COT - RSPL - Plumbing Final | Passed | 1.22.26 Approved |
|
| 01/29/2026 | RSBU - Building Progress | Passed | ||
| 02/09/2026 | RSBU - Building Final | Passed | ||
| 02/09/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/05/2026 | ENGR Engineering Final | Passed |