Permit: TC-MDP-0425-00247
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12806 E TORTOISE POINTE DR
Address NEW:
12806 E TORTOISE POINTE DR
Apply Date:
06/06/2025
Applicant:
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Permit Reviews
Permit Number - TC-MDP-0425-00247
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/10/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/23/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0425-00247
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/23/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 06/11/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 06/11/2025 | Post-Installed Anchor Inspection Report is required. |
| 06/11/2025 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0425-00247
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
| Date | Description | Comments |
|---|---|---|
| 04/23/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0425-00247
Permite Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/05/2025 | BULD - Electrical Clearance | N/A | Canceled | 9.5.2025 Cancelled per contractor. |
| 11/24/2025 | RSBU - Building Final | N/A | Re-inspection required | 11/24/25: cleanout at bedroom 4 must be properly capped and cut flush with wall, dishwasher supply line must be installed, garage door must be self closing, tiles on roof must be removed, HCS clean out is below grade please bring up flush to grade and verify that cap is properly installed. |
| 11/14/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 11.14.2025 Gas meter not set, cut flush exposed cleanout in bedroom 4, connect dishwasher water line, garage door needs to be tightened to be self-closing. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0425-00247
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2025 | COT - RSPL - Yard Water Line | Passed | Passed 7/10/25 ok to backfill | |
| 07/10/2025 | COT - RSPL - Sewer | Passed | Passed 7/10/25 ok to backfill | |
| 07/10/2025 | COT - RSPL - Rough Soil | Passed | Passed 7/10/25 ok to backfill | |
| 07/18/2025 | COT - RSEL - Grounding/Bonding | Passed | Partial pass for ufer only, will check connection at later date | |
| 07/18/2025 | COT - RSBU - Preslab | Passed | Passed 7/18/25 ok to pour concrete | |
| 07/18/2025 | COT - RSEL - Electrical Underground | Passed | Passed 7/18/25 ok to pour concrete | |
| 07/18/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 7/18/25 ok to pour concrete | |
| 08/11/2025 | COT - RSBU - Roof Nailing | Passed | 8.11.25 Shot pins, M1s, anchor bolts, a35s, rsp4s, truss schedule, fastener schedule, other hangers straps and hold downs all verified per plans. |
|
| 08/11/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 8.11.25 Shot pins, M1s, anchor bolts, a35s, rsp4s, truss schedule, fastener schedule, other hangers straps and hold downs all verified per plans. |
|
| 09/08/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 9.8.25 Approved per plans, ok to proceed |
|
| 09/08/2025 | COT - RSPL - Gas Pressure Test | Passed | pressure verified | |
| 09/08/2025 | BULD - Electrical Clearance | Passed | 9.8.25 Approved |
|
| 09/25/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 11/06/2025 | COT - BULD - SWG Clearance | Passed | 11.06.2025 Clearance for Southwest Gas. |
|
| 11/14/2025 | COT - RSEL - Electrical Final | Passed | ||
| 11/14/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 11/14/2025 | ENGR Engineering Final | Passed | ||
| 11/14/2025 | RSBU - Building Progress | Passed | ||
| 11/24/2025 | COT - RSPL - Plumbing Final | Passed | 11.24.2025 All corrections made. |
|
| 11/24/2025 | COT - RSME - Mechanical Final | Passed |