Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
04/28/2025
Applicant:
Dana Petty
Description:
Single Family Residence plan 130.1460 (Model Master Plan TC-MDP-0924-00984)

Permit Reviews

Permit Number - TC-MDP-0425-00242
Permit Status: Complete
Permit Description: Single Family Residence plan 130.1460 (Model Master Plan TC-MDP-0924-00984)
Start Date Submittal Complete Date Status  
05/01/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 05/12/2025 APPROVED Review Details
09/12/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/15/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0425-00242
Permit Status: Complete
Permit Description: Single Family Residence plan 130.1460 (Model Master Plan TC-MDP-0924-00984)
Date Description Comments
05/05/2025 Post-Installed Anchor Inspection Report is required.
05/05/2025 Post-Tension Inspection Report is required.
04/23/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
04/23/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0425-00242
Permite Description: Single Family Residence plan 130.1460 (Model Master Plan TC-MDP-0924-00984)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/25/2025 COT - RSEL - Electrical Final N/A Re-inspection required 1. All ceiling pre wires need to be capped with wire nuts.
2. Garage outlet by water heater is not GFCI protected.
09/25/2025 RSBU - Building Final N/A Re-inspection required 1. All ceiling pre wires need to be capped with wire nuts.
2. Garage outlet by water heater is not GFCI protected.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0425-00242
Permit Description: Single Family Residence plan 130.1460 (Model Master Plan TC-MDP-0924-00984)
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/11/2025 COT - RSPL - Rough Soil Passed 7-11-25: sewer connection and underground plumbing verified per plans.Okay to backfill with shading materials.
07/11/2025 COT - RSPL - Sewer Passed 7-11-25: sewer connection and underground plumbing verified per plans.Okay to backfill with shading materials.
07/11/2025 COT - RSPL - Yard Water Line Passed 7-11-25: main water line approved. Okay to backfill.
07/21/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 7-21-25: excavation/reinforcement/setbacks and preslab approved. Okay to pour concrete.
07/21/2025 COT - RSBU - Preslab Passed 7-21-25: excavation/reinforcement/setbacks and preslab approved. Okay to pour concrete.
07/21/2025 COT - RSEL - Electrical Underground Passed 7-21-25: electrical underground approved.
07/28/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 7.28.25
Passed
07/28/2025 COT - RSBU - Roof Nailing Passed 7.28.25
passed
08/05/2025 BULD - Electrical Clearance Passed
08/05/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 8.5.25
approved
08/05/2025 COT - RSEL - Grounding/Bonding Passed 8.5.25
approved
08/05/2025 COT - RSPL - Gas Pressure Test Passed
08/15/2025 COT - RSBU - Interior Shear Bracing Passed 5.18.25
Fastener schedule verified
09/15/2025 COT - BULD - SWG Clearance Passed 9.15.25
Approved for gas clearance
09/25/2025 COT - RSEL - Outdoor Lighting Passed
09/25/2025 COT - RSME - Mechanical Final Passed
09/25/2025 COT - RSPL - Plumbing Final Passed
09/25/2025 RSBU - Building Progress Passed
09/29/2025 COT - RSEL - Electrical Final Passed 9.29.25
Corrections made
Approved
09/29/2025 ENGR Engineering Final Passed Site is clean and accessible; built in accordance with approved plans.
09/29/2025 RSBU - Building Final Passed 9.29.25
Corrections made
Approved

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
156022 PT LOT 104 COMPLETE-2025-09-10_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 104 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 104 SPECIAL INSPECTION CERTIFICATE-2025-04-28_V1.PDF DOCUMENTS VIEW