Permit: TC-MDP-0425-00242
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6763 E VIA DEL CANTILLO
Address NEW:
6763 E VIA DEL CANTILLO
Apply Date:
04/28/2025
Applicant:
Dana Petty
Description:
Single Family Residence plan 130.1460 (Model Master Plan TC-MDP-0924-00984)
Permit Reviews
Permit Number - TC-MDP-0425-00242
Permit Status: Complete
Permit Description: Single Family Residence plan 130.1460 (Model Master Plan TC-MDP-0924-00984)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/01/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 05/12/2025 | APPROVED |
| 09/12/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/15/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0425-00242
Permit Status: Complete
Permit Description: Single Family Residence plan 130.1460 (Model Master Plan TC-MDP-0924-00984)
| Date | Description | Comments |
|---|---|---|
| 05/05/2025 | Post-Installed Anchor Inspection Report is required. | |
| 05/05/2025 | Post-Tension Inspection Report is required. | |
| 04/23/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 04/23/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0425-00242
Permite Description: Single Family Residence plan 130.1460 (Model Master Plan TC-MDP-0924-00984)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 1. All ceiling pre wires need to be capped with wire nuts. 2. Garage outlet by water heater is not GFCI protected. |
| 09/25/2025 | RSBU - Building Final | N/A | Re-inspection required | 1. All ceiling pre wires need to be capped with wire nuts. 2. Garage outlet by water heater is not GFCI protected. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0425-00242
Permit Description: Single Family Residence plan 130.1460 (Model Master Plan TC-MDP-0924-00984)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/11/2025 | COT - RSPL - Rough Soil | Passed | 7-11-25: sewer connection and underground plumbing verified per plans.Okay to backfill with shading materials. | |
| 07/11/2025 | COT - RSPL - Sewer | Passed | 7-11-25: sewer connection and underground plumbing verified per plans.Okay to backfill with shading materials. | |
| 07/11/2025 | COT - RSPL - Yard Water Line | Passed | 7-11-25: main water line approved. Okay to backfill. | |
| 07/21/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 7-21-25: excavation/reinforcement/setbacks and preslab approved. Okay to pour concrete. | |
| 07/21/2025 | COT - RSBU - Preslab | Passed | 7-21-25: excavation/reinforcement/setbacks and preslab approved. Okay to pour concrete. | |
| 07/21/2025 | COT - RSEL - Electrical Underground | Passed | 7-21-25: electrical underground approved. | |
| 07/28/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 7.28.25 Passed |
|
| 07/28/2025 | COT - RSBU - Roof Nailing | Passed | 7.28.25 passed |
|
| 08/05/2025 | BULD - Electrical Clearance | Passed | ||
| 08/05/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 8.5.25 approved |
|
| 08/05/2025 | COT - RSEL - Grounding/Bonding | Passed | 8.5.25 approved |
|
| 08/05/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 08/15/2025 | COT - RSBU - Interior Shear Bracing | Passed | 5.18.25 Fastener schedule verified |
|
| 09/15/2025 | COT - BULD - SWG Clearance | Passed | 9.15.25 Approved for gas clearance |
|
| 09/25/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 09/25/2025 | COT - RSME - Mechanical Final | Passed | ||
| 09/25/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 09/25/2025 | RSBU - Building Progress | Passed | ||
| 09/29/2025 | COT - RSEL - Electrical Final | Passed | 9.29.25 Corrections made Approved |
|
| 09/29/2025 | ENGR Engineering Final | Passed | Site is clean and accessible; built in accordance with approved plans. | |
| 09/29/2025 | RSBU - Building Final | Passed | 9.29.25 Corrections made Approved |