Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Address:
9501 E HARKES DR
Address NEW:
9501 E HARKES DR
Apply Date:
05/23/2025
Applicant:
Brianna Quiroz
Description:
Arches Model Plan (Model master plan TC-MDP-1222-00129)

Permit Reviews

Permit Number - TC-MDP-0425-00222
Permit Status: Inspections
Permit Description: Arches Model Plan (Model master plan TC-MDP-1222-00129)
Start Date Submittal Complete Date Status  
06/06/2025 SITE FROM MODEL PERMIT - PRODUCTION v.2 06/06/2025 REQUIRES RESUBMIT Review Details
12/26/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/29/2025 APPROVED Review Details
05/28/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/28/2025 REQUIRES RESUBMIT Review Details
07/03/2025 SITE FROM MODEL PERMIT - PRODUCTION v.3 07/10/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0425-00222
Permit Status: Inspections
Permit Description: Arches Model Plan (Model master plan TC-MDP-1222-00129)
Date Description Comments
07/10/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
07/03/2025 Post-Installed Anchor Inspection Report is required.
07/03/2025 Post-Tension Inspection Report is required.
04/01/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
04/01/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
07/03/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
12/29/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0425-00222
Permite Description: Arches Model Plan (Model master plan TC-MDP-1222-00129)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/28/2025 COT - BULD - SWG Clearance N/A Not Applicable
10/28/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0425-00222
Permit Description: Arches Model Plan (Model master plan TC-MDP-1222-00129)
Total Completed Inspections - 12
Date Description Inspector Results Comments
08/15/2025 COT - RSPL - Rough Soil Passed 8.15.25
Trench conditions good
Plumbing verified per plans
Tracers verified
Water under pressure
Under test verified
APPROVED
08/15/2025 COT - RSPL - Sewer Passed 8.15.25
Trench conditions good
Plumbing verified per plans
Tracers verified
Water under pressure
Under test verified
APPROVED
08/15/2025 COT - RSPL - Yard Water Line Passed 8.15.25
Trench conditions good
Plumbing verified per plans
Tracers verified
Water under pressure
Under test verified
APPROVED
08/22/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 8.22.25
Approved
08/22/2025 COT - RSBU - Preslab Passed 8.22.25
Approved
08/22/2025 COT - RSEL - Electrical Underground Passed 8.22.25
Approved
08/22/2025 COT - RSEL - Grounding/Bonding Passed 8.22.25
Partial Pass uffer
10/28/2025 BULD - Electrical Clearance Passed Passed 10/28/25
10/28/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 10/28/25
11/03/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11/3/25 truss calcs on site, passed
11/03/2025 COT - RSBU - Roof Nailing Passed 11/3/25 truss calcs on site, passed
11/10/2025 COT - RSBU - Interior Shear Bracing Passed 11-10-25: drywall nailing approved. Okay for tape & texture.

Documents

File Name Document Type  
LOT 82 SIC-2025-12-22_V1.PDF DOCUMENTS VIEW
Z140- ARCHES TRUSS CALCS R1 STAMPED_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LA ESCALERA (MIRADOR) LOT 82_V3.PDF DOCUMENTS VIEW
PHASE 1A LOT 82 SIC-2025-07-02_V3.PDF DOCUMENTS VIEW