Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
3040 N SIBLEY MINE RD
Apply Date:
08/19/2024
Applicant:
Description:
SFR K35I T21-M0034

Permit Reviews

Permit Number - TC-MDP-0424-00540
Permit Status: Inspections complete
Permit Description: SFR K35I T21-M0034
Start Date Submittal Complete Date Status  
08/22/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 08/26/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0424-00540
Permit Status: Inspections complete
Permit Description: SFR K35I T21-M0034
Total Outstanding Activity Conditions - 4
Date Name
04/29/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/26/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/26/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/26/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0424-00540
Permit Status: Inspections complete
Permit Description: SFR K35I T21-M0034
Date Description Comments
04/29/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/26/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00540
Permit Description: SFR K35I T21-M0034
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/13/2024 COT - RSPL - Rough Soil Passed 9/10/24: canceled per Gonzalo
9/11/24: please expose all fittings 360 degrees, possible leak.
9/13/24: corrections made ok to proceed.
09/13/2024 COT - RSPL - Sewer Passed
09/13/2024 COT - RSPL - Yard Water Line Passed 9/10/24: canceled per Gonzalo
9/11/24: please expose all fittings 360 degrees, possible leak.
9/13/24: corrections made ok to proceed.
09/18/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
09/18/2024 COT - RSBU - Preslab Passed
09/18/2024 COT - RSEL - Electrical Underground Passed
10/03/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/03/2024 COT - RSBU - Roof Nailing Passed
10/30/2024 COT - RSEL - Grounding/Bonding Passed
10/30/2024 BULD - Electrical Clearance Passed
10/30/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed OK to insulate and cover walls.
10/30/2024 COT - RSPL - Gas Pressure Test Passed
11/13/2024 COT - RSBU - Interior Shear Bracing Passed 11/13/24 pass
01/13/2025 COT - BULD - SWG Clearance Passed
01/16/2025 COT - RSEL - Electrical Final Passed
01/16/2025 COT - RSEL - Outdoor Lighting Passed
01/16/2025 COT - RSME - Mechanical Final Passed
01/16/2025 COT - RSPL - Plumbing Final Passed
01/16/2025 ENGR Engineering Final Passed
01/16/2025 RSBU - Building Final Passed
01/16/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-08-19_V1.PDF DOCUMENTS VIEW