Permit: TC-MDP-0424-00524
Permit Details
Apply Date:
04/25/2024
Applicant:
Brianna Quiroz
Description:
Eisenhower Model Plan La Escalera
Permit Reviews
Permit Number - TC-MDP-0424-00524
Permit Status: Complete
Permit Description: Eisenhower Model Plan La Escalera
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/01/2024 | APPROVED |
12/20/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/26/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0424-00524
Permit Status: Complete
Permit Description: Eisenhower Model Plan La Escalera
Date | Description | Comments |
---|---|---|
04/30/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
04/30/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/30/2024 | Post-Tension Inspection Report is required. | |
04/25/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/25/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
04/30/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
04/30/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0424-00524
Permite Description: Eisenhower Model Plan La Escalera
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/04/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | Pex needs to be 18" from copper at main line. 9/4/2024 |
01/03/2025 | ENGR Engineering Final | N/A | Re-inspection required | Electric Service Panel unfinished. Solar is currently being installed. Please call and reschedule when ready. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0424-00524
Permit Description: Eisenhower Model Plan La Escalera
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/30/2024 | COT - RSPL - Rough Soil | Passed | ||
05/30/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/11/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/11/2024 | COT - RSBU - Preslab | Passed | ||
06/11/2024 | COT - RSEL - Electrical Underground | Passed | ||
06/11/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
06/24/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
06/24/2024 | COT - RSBU - Roof Nailing | Passed | ||
09/04/2024 | COT - BULD - SWG Clearance | Passed | ||
09/04/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/17/2024 | RSBU - Building Progress | Passed | 9/17/24: 18 inches of copper top and bottom before sweat joint outside of wall main water line | |
09/19/2024 | COT - RSPL - Sewer | Passed | ||
10/07/2024 | COT - RSBU - Interior Shear Bracing | Passed | 10/7/24: Drywall installed throughout house, interior shear walls are properly secured to the studs per the plan. Okay to proceed with tape, texture, and paint. | |
11/08/2024 | BULD - Electrical Clearance | Passed | ECO CLEARANCE ISSUED. | |
01/03/2025 | COT - RSEL - Electrical Final | Passed | Passed final 1/3/25 | |
01/03/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 1/3/25 | |
01/03/2025 | COT - RSME - Mechanical Final | Passed | Passed final 1/3/25 | |
01/03/2025 | COT - RSPL - Plumbing Final | Passed | No | |
01/07/2025 | RSBU - Building Final | Passed | 1/7/25 corrections made | |
01/07/2025 | ENGR Engineering Final | Passed |