Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
9556 E HARKES DR
Address NEW:
9556 E HARKES DR
Apply Date:
11/13/2024
Applicant:
Brianna Quiroz
Description:
Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)

Permit Reviews

Permit Number - TC-MDP-0424-00516
Permit Status: Complete
Permit Description: Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)
Start Date Submittal Complete Date Status  
11/15/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/04/2024 APPROVED Review Details
07/11/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/14/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0424-00516
Permit Status: Complete
Permit Description: Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)
Date Description Comments
11/15/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/18/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/18/2024 Post-Tension Inspection Report is required.
04/25/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/25/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
11/18/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/18/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00516
Permite Description: Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
02/11/2025 COT - BULD - SWG Clearance N/A Not Applicable site does not use gas
02/11/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable site does not use gas
03/19/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 3/19/25 damaged stud at stairs, loose roofing at marked areas through, add nails to Simpson clips at garage
04/30/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Fire foam and caulk penetrations throughout

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00516
Permit Description: Eisenhower Model Plan La Escalera (Model Master Plan TC-MDP-1222-00133)
Total Completed Inspections - 19
Date Description Inspector Results Comments
02/11/2025 COT - RSEL - Electrical Underground Passed Passed 2/11/25 ok to backfill
02/11/2025 COT - RSPL - Rough Soil Passed Passed 2/11/25 ok to backfill
02/11/2025 COT - RSPL - Sewer Passed Passed 2/11/25 ok to backfill
02/11/2025 COT - RSPL - Yard Water Line Passed Passed 2/11/25 ok to backfill
02/26/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 26 FEB 25
Passed.
02/26/2025 COT - RSBU - Preslab Passed 02/26/25
Pass
04/03/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 3 April 25
pass
04/03/2025 COT - RSBU - Roof Nailing Passed 3 April 25
pass
04/11/2025 BULD - Electrical Clearance Passed 11 April 25
TEP CLEARANCE "ECO
04/11/2025 COT - RSEL - Grounding/Bonding Passed 11 April 25
Pass
05/05/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5/5/25 corrections made
05/23/2025 COT - RSBU - Interior Shear Bracing Passed 5/23/25 corrections made
08/12/2025 RSBU - Building Final Passed 8.12.25
Finals verified
08/12/2025 RSBU - Building Progress Passed 8.12.25
Finals verified
08/12/2025 ENGR Engineering Final Passed Cap block to the right of gate needs to be finished.
08/12/2025 COT - RSPL - Plumbing Final Passed 8.12.25
Finals verified
08/12/2025 COT - RSME - Mechanical Final Passed 8.12.25
Finals verified
08/12/2025 COT - RSEL - Outdoor Lighting Passed 8.12.25
Finals verified
08/12/2025 COT - RSEL - Electrical Final Passed 8.12.25
Finals verified

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 33 SIC-2025-07-09_V1.PDF DOCUMENTS VIEW
USE - PATTISON SOILS REPORT 1.25.2022_V1.PDF DOCUMENTS VIEW
Z510 EISENHOWER - TRUSS REVIEW LETTER - LAYOUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 33 PLOT PLAN_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 33 SIC-2024-11-13_V1.PDF DOCUMENTS VIEW