Permit: TC-MDP-0424-00513
Permit Details
Apply Date:
04/25/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0424-00513
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/29/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/06/2024 | APPROVED |
11/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/07/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0424-00513
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date | Description | Comments |
---|---|---|
05/01/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
05/01/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
05/01/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/01/2024 | Post-Tension Inspection Report is required. | |
04/25/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/25/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
05/01/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0424-00513
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/18/2024 | COT - RSPL - Rough Soil | Passed | ||
09/18/2024 | COT - RSPL - Sewer | Passed | ||
09/18/2024 | COT - RSPL - Yard Water Line | Passed | ||
09/25/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, rebar reinforcement is installed per plans, shear wall hold downs and masa clips are attached to formwork, underground pipes are properly wrapped, and Ufer ground is in place. Okay to proceed with concrete pour. | |
09/25/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, rebar reinforcement is installed per plans, shear wall hold downs and masa clips are attached to formwork, underground pipes are properly wrapped, and Ufer ground is in place. Okay to proceed with concrete pour. | |
09/25/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, rebar reinforcement is installed per plans, shear wall hold downs and masa clips are attached to formwork, underground pipes are properly wrapped, and Ufer ground is in place. Okay to proceed with concrete pour. | |
09/25/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, rebar reinforcement is installed per plans, shear wall hold downs and masa clips are attached to formwork, underground pipes are properly wrapped, and Ufer ground is in place. Okay to proceed with concrete pour. | |
10/08/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
10/08/2024 | COT - RSBU - Roof Nailing | Passed | ||
10/30/2024 | BULD - Electrical Clearance | Passed | ECO Clearance issued. | |
10/30/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15 psi of air pressure with no leaks. Okay to proceed with other work. | |
10/30/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | M, P, AND E rough-in is complete. Okay to proceed with insulation and drywall installation. | |
11/13/2024 | COT - RSBU - Interior Shear Bracing | Passed | passed |