Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
04/25/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0424-00513
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date Submittal Complete Date Status  
04/29/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/06/2024 APPROVED Review Details
11/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/07/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0424-00513
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date Description Comments
05/01/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/01/2024 Post-Tension Inspection Report is required.
04/25/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/25/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/01/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0424-00513
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 13
Date Description Inspector Results Comments
09/18/2024 COT - RSPL - Rough Soil Passed
09/18/2024 COT - RSPL - Sewer Passed
09/18/2024 COT - RSPL - Yard Water Line Passed
09/25/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, rebar reinforcement is installed per plans, shear wall hold downs and masa clips are attached to formwork, underground pipes are properly wrapped, and Ufer ground is in place. Okay to proceed with concrete pour.
09/25/2024 COT - RSBU - Preslab Passed Concrete forms are set, rebar reinforcement is installed per plans, shear wall hold downs and masa clips are attached to formwork, underground pipes are properly wrapped, and Ufer ground is in place. Okay to proceed with concrete pour.
09/25/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, rebar reinforcement is installed per plans, shear wall hold downs and masa clips are attached to formwork, underground pipes are properly wrapped, and Ufer ground is in place. Okay to proceed with concrete pour.
09/25/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set, rebar reinforcement is installed per plans, shear wall hold downs and masa clips are attached to formwork, underground pipes are properly wrapped, and Ufer ground is in place. Okay to proceed with concrete pour.
10/08/2024 COT - RSBU - Exterior Clips/Sheathing Passed
10/08/2024 COT - RSBU - Roof Nailing Passed
10/30/2024 BULD - Electrical Clearance Passed ECO Clearance issued.
10/30/2024 COT - RSPL - Gas Pressure Test Passed Gas line is under 15 psi of air pressure with no leaks. Okay to proceed with other work.
10/30/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed M, P, AND E rough-in is complete. Okay to proceed with insulation and drywall installation.
11/13/2024 COT - RSBU - Interior Shear Bracing Passed passed

Documents

File Name Document Type  
150401 PT LOT 195 COMPLETE-2024-11-06_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 195 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 195 SPECIAL INSPECTION CERTIFICATE-2024-04-26_V1.PDF DOCUMENTS VIEW