Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0424-00512
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
353 N SPRING FLOWER DR
Address NEW:
353 N SPRING FLOWER DR
Apply Date:
06/03/2024
Applicant:
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0424-00512
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/03/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/05/2024 | APPROVED |
| 12/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/06/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0424-00512
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
| Date | Description | Comments |
|---|---|---|
| 06/03/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 06/03/2024 | Post-Installed Anchor Inspection Report is required. | |
| 06/03/2024 | Post-Tension Inspection Report is required. | |
| 04/25/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/25/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 06/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0424-00512
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is installed and connected to the backwater valve and city sewer line. Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 09/30/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is installed and connected to the backwater valve and city sewer line. Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 09/30/2024 | COT - RSPL - Yard Water Line | Passed | Main water line to house is connected to the water meter, tracer wire installed, and under street pressure with no leaks. Okay to shade pipe and backfill trench. | |
| 09/30/2024 | COT - RSPL - Backwater Valve | Passed | Underground plumbing is installed and connected to the backwater valve and city sewer line. Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 10/09/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/09/2024 | COT - RSBU - Preslab | Passed | ||
| 10/09/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 10/09/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/18/2024 | COT - RSBU - Roof Nailing | Passed | Okay to proceed with rough-in work. | |
| 10/18/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Okay to proceed with rough-in work. | |
| 12/02/2024 | BULD - Electrical Clearance | Passed | ECO CLEARANCE ISSUED. | |
| 12/02/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough in is complete. Okay to proceed with insulation and drywall installation. | |
| 12/02/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15 psi of air pressure with no leaks. Okay to proceed with other work. | |
| 12/16/2024 | COT - RSBU - Interior Shear Bracing | Passed | 12/16/24 pass | |
| 02/06/2025 | COT - BULD - SWG Clearance | Passed | 2-6-25, okay for Southwest gas to install meter. Clearance issued. | |
| 02/28/2025 | COT - RSEL - Electrical Final | Passed | Passed final 2/28/25 CLEARANCE ECO | |
| 02/28/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 2/28/25 | |
| 02/28/2025 | COT - RSME - Mechanical Final | Passed | Passed final 2/28/25 | |
| 02/28/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 2/28/25 | |
| 02/28/2025 | RSBU - Building Final | Passed | Passed final 2/28/25 | |
| 02/28/2025 | RSBU - Building Progress | Passed | Passed final 2/28/25 | |
| 03/19/2025 | ENGR Engineering Final | Passed |