Permit: TC-MDP-0424-00509
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6846 E PASEO DE VILLALOBOS
Address NEW:
6846 E PASEO DE VILLALOBOS
Apply Date:
05/30/2024
Applicant:
Dana Petty
Description:
SFR 230.2380 T21-M0028
Permit Reviews
Permit Number - TC-MDP-0424-00509
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/30/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 06/04/2024 | APPROVED |
| 10/03/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/04/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0424-00509
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
| Date | Description | Comments |
|---|---|---|
| 06/03/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 06/03/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 06/03/2024 | Post-Tension Inspection Report is required. | |
| 04/25/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/25/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 06/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0424-00509
Permite Description: SFR 230.2380 T21-M0028
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Partial Pass | Provide anchor bolts at all marked areas. 9/3/2024 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0424-00509
Permit Description: SFR 230.2380 T21-M0028
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/09/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 8/9/2024 | |
| 08/12/2024 | COT - RSPL - Rough Soil | Passed | ||
| 08/12/2024 | COT - RSPL - Sewer | Passed | ||
| 08/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/19/2024 | COT - RSBU - Preslab | Passed | ||
| 08/19/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 08/19/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/03/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 09/06/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 10/03/2024 | BULD - Electrical Clearance | Passed | PASSED ELECTRICAL CLEARANCE ECO 10/3/24 | |
| 10/03/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed intermediate inspection 10/3/24 | |
| 10/03/2024 | COT - RSPL - Gas Pressure Test | Passed | Passed intermediate inspection 10/3/24 | |
| 10/23/2024 | COT - RSBU - Interior Shear Bracing | Passed | 10-23-24, interior shear wall bracing approved.Okay for tape and texture. | |
| 11/21/2024 | COT - BULD - SWG Clearance | Passed | 11-21-24, approved for Southwest gas to install meter. | |
| 12/10/2024 | COT - RSEL - Electrical Final | Passed | Passed final inspection 12/10/24 | |
| 12/10/2024 | COT - RSEL - Outdoor Lighting | Passed | Passed final inspection 12/10/24 | |
| 12/10/2024 | COT - RSME - Mechanical Final | Passed | Passed final inspection 12/10/24 | |
| 12/10/2024 | COT - RSPL - Plumbing Final | Passed | Passed final inspection 12/10/24 | |
| 12/10/2024 | RSBU - Building Final | Passed | Passed final inspection 12/10/24 | |
| 12/10/2024 | RSBU - Building Progress | Passed | Passed final inspection 12/10/24 | |
| 12/12/2024 | ENGR Engineering Final | Passed |