Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/30/2024
Applicant:
Daria Hopkins
Description:
SFR 230.2380 T21-M0028

Permit Reviews

Permit Number - TC-MDP-0424-00509
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Start Date Submittal Complete Date Status  
05/30/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/04/2024 APPROVED Review Details
10/03/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/04/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0424-00509
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Date Description Comments
06/03/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/03/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/03/2024 Post-Tension Inspection Report is required.
04/25/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/25/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/03/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00509
Permite Description: SFR 230.2380 T21-M0028
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/03/2024 COT - RSBU - Exterior Clips/Sheathing N/A Partial Pass Provide anchor bolts at all marked areas. 9/3/2024

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00509
Permit Description: SFR 230.2380 T21-M0028
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/09/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 8/9/2024
08/12/2024 COT - RSPL - Rough Soil Passed
08/12/2024 COT - RSPL - Sewer Passed
08/19/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/19/2024 COT - RSBU - Preslab Passed
08/19/2024 COT - RSEL - Electrical Underground Passed
08/19/2024 COT - RSEL - Grounding/Bonding Passed
09/03/2024 COT - RSBU - Roof Nailing Passed
09/06/2024 COT - RSBU - Exterior Clips/Sheathing Passed
10/03/2024 BULD - Electrical Clearance Passed PASSED ELECTRICAL CLEARANCE ECO 10/3/24
10/03/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed intermediate inspection 10/3/24
10/03/2024 COT - RSPL - Gas Pressure Test Passed Passed intermediate inspection 10/3/24
10/23/2024 COT - RSBU - Interior Shear Bracing Passed 10-23-24, interior shear wall bracing approved.Okay for tape and texture.
11/21/2024 COT - BULD - SWG Clearance Passed 11-21-24, approved for Southwest gas to install meter.
12/10/2024 COT - RSEL - Electrical Final Passed Passed final inspection 12/10/24
12/10/2024 COT - RSEL - Outdoor Lighting Passed Passed final inspection 12/10/24
12/10/2024 COT - RSME - Mechanical Final Passed Passed final inspection 12/10/24
12/10/2024 COT - RSPL - Plumbing Final Passed Passed final inspection 12/10/24
12/10/2024 RSBU - Building Final Passed Passed final inspection 12/10/24
12/10/2024 RSBU - Building Progress Passed Passed final inspection 12/10/24
12/12/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
149661 PT LOT 50 COMPLETE-2024-10-03_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 50 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 50 SPECIAL INSPECTION CERTIFICATE-2024-05-30_V1.PDF DOCUMENTS VIEW