Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
06/24/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130

Permit Reviews

Permit Number - TC-MDP-0424-00501
Permit Status: Issued
Permit Description: Bella Tierra Phase 3 1745-130
Start Date Submittal Complete Date Status  
06/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0424-00501
Permit Status: Issued
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 5
Date Name
04/17/2024 Post-Tension Inspection Report is required.
04/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/17/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
06/28/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/28/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Conditions

Permit Number - TC-MDP-0424-00501
Permit Status: Issued
Permit Description: Bella Tierra Phase 3 1745-130
Date Description Comments
04/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0424-00501
Permite Description: Bella Tierra Phase 3 1745-130
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/08/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Failed Electrical main panel circuits not to plan

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0424-00501
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 15
Date Description Inspector Results Comments
08/06/2024 COT - RSPL - Rough Soil Passed
08/06/2024 COT - RSPL - Yard Water Line Passed
08/06/2024 COT - RSPL - Sewer Passed
08/06/2024 COT - RSPL - Backwater Valve Passed
08/14/2024 RSBU - Building Progress Passed
08/13/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/13/2024 COT - RSBU - Preslab Passed
08/13/2024 COT - RSEL - Electrical Underground Passed
08/14/2024 COT - RSEL - Grounding/Bonding Passed Ufer ground is in place and properly supported off of ground.
08/23/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly secured to top plate and plywood sheathing is properly secured to trusses with nails and staples. Okay to proceed with top out of plumbing.
08/28/2024 COT - RSBU - Exterior Clips/Sheathing Passed 8/28/24: Titan bolts, red heads, and cut nails have been installed in bottom plate where needed. Lateral bracing has been added where missing. Loose roof sheathing has been properly nailed.
10/02/2024 COT - RSPL - Gas Pressure Test Passed Gas line is under 15 psi air pressure test.
10/11/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough in are complete. Okay to proceed with insulation and drywall installation.
10/28/2024 COT - RSBU - Interior Shear Bracing Passed
10/30/2024 BULD - Electrical Clearance Passed 10-30-24, panel okay to be energized.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 40 START_V1.PDF DOCUMENTS VIEW
BTIII 40 SIC-2024-06-24_V1.PDF DOCUMENTS VIEW