Permit: TC-MDP-0424-00498
Permit Details
Apply Date:
05/16/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130
Permit Reviews
Permit Number - TC-MDP-0424-00498
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/16/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00498
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
04/17/2024 | Post-Tension Inspection Report is required. |
04/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
04/17/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
05/20/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
05/20/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0424-00498
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Date | Description | Comments |
---|---|---|
04/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00498
Permite Description: Bella Tierra Phase 3 1745-130
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/13/2024 | RSBU - Building Progress | N/A | Not Applicable | |
11/15/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | |
11/15/2024 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | |
11/15/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | No post tension tag, exterior GFCI trips, exterior register by entrance open and exposed. 11/15/24 |
11/15/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | |
11/15/2024 | RSBU - Building Final | N/A | Re-inspection required | No post tension tag, exterior GFCI trips, exterior register by entrance open and exposed. 11/15/24 |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00498
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/17/2024 | COT - RSPL - Rough Soil | Passed | Plumbing underground is complete and under a water test with no leaks. Okay to shade pipe and backfill trenches. | |
06/17/2024 | COT - RSPL - Yard Water Line | Passed | Main water supply line is installed from house to meter box. Supply line is under an air pressure test of 62# psi with no leaks. Okay to shade pipe and backfill trench. | |
06/21/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/21/2024 | COT - RSBU - Preslab | Passed | ||
06/21/2024 | COT - RSEL - Electrical Underground | Passed | ||
06/21/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
07/12/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Exterior sheathing for shear walls is properly secured to studs, all bolts are secured to concrete floor, and all lateral bracing is properly installed and secured to studs. Okay to proceed with rough-in. | |
07/12/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is properly secured to trusses with staples per code and plan specifications. Okay to proceed with rough-in. | |
08/29/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
08/29/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/18/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
10/02/2024 | COT - RSPL - Sewer | Passed | ||
10/30/2024 | BULD - Electrical Clearance | Passed | 10-30-24, panel okay to be energized. | |
10/30/2024 | COT - BULD - SWG Clearance | Passed | 10-30-24, approved for southwest gas connection. | |
11/15/2024 | ENGR Engineering Final | Passed | CO Ready | |
11/22/2024 | COT - RSEL - Electrical Final | Passed | 11/22/24: All construction work is completed, post tension tag is installed on exterior hose bib. Okay to issue Certificate of Occupancy. | |
11/22/2024 | COT - RSEL - Outdoor Lighting | Passed | 11/22/24: All construction work is completed, post tension tag is installed on exterior hose bib. Okay to issue Certificate of Occupancy. | |
11/22/2024 | COT - RSME - Mechanical Final | Passed | 11/22/24: All construction work is completed, post tension tag is installed on exterior hose bib. Okay to issue Certificate of Occupancy. | |
11/22/2024 | COT - RSPL - Plumbing Final | Passed | 11/22/24: All construction work is completed, post tension tag is installed on exterior hose bib. Okay to issue Certificate of Occupancy. | |
11/22/2024 | RSBU - Building Final | Passed | 11/22/24: All construction work is completed, post tension tag is installed on exterior hose bib. Okay to issue Certificate of Occupancy. |