Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
04/17/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130

Permit Reviews

Permit Number - TC-MDP-0424-00497
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Start Date Submittal Complete Date Status  
04/18/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/25/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0424-00497
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 6
Date Name
04/17/2024 Post-Tension Inspection Report is required.
04/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/17/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
04/19/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/19/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/22/2023 THIS DOES NOT APPLY

Conditions

Permit Number - TC-MDP-0424-00497
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Date Description Comments
04/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/22/2023 THIS DOES NOT APPLY

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00497
Permite Description: Bella Tierra Phase 3 1745-130
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/30/2024 COT - RSPL - Yard Water Line N/A Re-inspection required 4/30/24: line not under test
07/31/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Secure main water line. Water lines are not fully pressurized. Leak in master bathroom. Vanity to the right. (ABS). Provide long plate on both sides of hood vent and nail every hole for protection and reinforcement of top plate. Add blocking to register in hallway. 7/31/2024

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00497
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/01/2024 COT - RSPL - Yard Water Line Passed 5/1/24: Line is under an air pressure test of 70# with no leaks. Okay to shade pipe and backfill trench.
05/01/2024 COT - RSPL - Rough Soil Passed Passed on 4/30/24 by E. Adams.
05/31/2024 COT - RSEL - Electrical Underground Passed
05/31/2024 COT - RSEL - Grounding/Bonding Passed
06/03/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/03/2024 COT - RSBU - Preslab Passed
06/12/2024 COT - RSBU - Exterior Clips/Sheathing Passed Plywood sheathing for exterior shear walls is properly secured to studs per plan requirements. All masa clips and shear wall hold downs are properly nailed to bottom plates and wall studs. Bottom plates are secured with cut nails, titan bolts, or j-bolts. Okay to proceed with plumbing top out.
06/12/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly secured to top plate with nails and H2.5 hurricane ties. Plywood sheathing is securely attached to trusses with nails per plan. Okay to proceed with plumbing top out.
07/29/2024 COT - RSPL - Gas Pressure Test Passed Gas line is under a 15 pound pressure test with no leaks.
08/02/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 8/2/24: Corrections have been made, tub & shower are filled with water, air pressure is at 60 pounds on the water line. Okay to proceed with insulation and drywall installation.
08/06/2024 BULD - Electrical Clearance Passed TEP ECO
08/22/2024 COT - RSBU - Interior Shear Bracing Passed
09/09/2024 COT - RSPL - Sewer Passed Sewer line is properly connected to underground plumbing. Okay to shade pipe and backfill trench.
10/03/2024 COT - BULD - SWG Clearance Passed 10-3-24, verified equipment in place. Clearance issued to Southwest Gas.
10/25/2024 COT - RSEL - Electrical Final Passed Construction is completed per plans. Okay to issue Certificate of Occupancy.
10/25/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is installed and operational per plan and city requirements.
10/25/2024 COT - RSME - Mechanical Final Passed Construction is completed per plans. Okay to issue Certificate of Occupancy.
10/25/2024 COT - RSPL - Plumbing Final Passed Construction is completed per plans. Okay to issue Certificate of Occupancy.
10/25/2024 ENGR Engineering Final Passed
10/25/2024 RSBU - Building Final Passed Construction is completed per plans. Okay to issue Certificate of Occupancy.
10/25/2024 RSBU - Building Progress Passed Construction is completed per plans. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 16 START_V1.PDF DOCUMENTS VIEW
BTIII 16 SIC-2024-04-17_V1.PDF DOCUMENTS VIEW