Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
10/07/2024
Applicant:
Andrea Flood
Description:
SFR RKK35L T21-M0084 REVISION-Structural changes

Permit Reviews

Permit Number - TC-MDP-0424-00492
Permit Status: Inspections complete
Permit Description: SFR RKK35L T21-M0084 REVISION-Structural changes
Start Date Submittal Complete Date Status  
10/08/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/10/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0424-00492
Permit Status: Inspections complete
Permit Description: SFR RKK35L T21-M0084 REVISION-Structural changes
Total Outstanding Activity Conditions - 7
Date Name
04/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
10/10/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/10/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/10/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/10/2024 Post-Tension Inspection Report is required.
10/10/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
10/10/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0424-00492
Permit Status: Inspections complete
Permit Description: SFR RKK35L T21-M0084 REVISION-Structural changes
Date Description Comments
10/08/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
04/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00492
Permite Description: SFR RKK35L T21-M0084 REVISION-Structural changes
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/20/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required Add anchor bolts and H25 clip at marked areas, add king stud to window in bedroom 3 per plan 12/20/24
12/20/2024 COT - RSBU - Roof Nailing N/A Re-inspection required Add anchor bolts and H25 clip at marked areas, add king stud to window in bedroom 3 per plan 12/20/24

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00492
Permit Description: SFR RKK35L T21-M0084 REVISION-Structural changes
Total Completed Inspections - 21
Date Description Inspector Results Comments
12/03/2024 COT - RSPL - Rough Soil Passed 12-3-24, sewer connection, main water line, and underground plumbing verified as per approved plans. Okay to backfill with shading.
12/03/2024 COT - RSPL - Sewer Passed 12-3-24, sewer connection, main water line, and underground plumbing verified as per approved plans. Okay to backfill with shading.
12/03/2024 COT - RSPL - Yard Water Line Passed 12-3-24, sewer connection, main water line, and underground plumbing verified as per approved plans. Okay to backfill with shading.
12/10/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 12-10-24, grounding/bonding, electrical underground, setbacks, preslab approved. Okay to pour concrete.
12/10/2024 COT - RSBU - Preslab Passed 12-10-24, grounding/bonding, electrical underground, setbacks, preslab approved. Okay to pour concrete.
12/10/2024 COT - RSEL - Electrical Underground Passed 12-10-24, electrical underground, setbacks, preslab approved. Okay to pour concrete.
12/10/2024 COT - RSEL - Grounding/Bonding Passed 12-10-24, grounding/bonding, electrical underground, setbacks, preslab approved. Okay to pour concrete.
12/26/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 12-26-24, approved. Okay to continue construction.
12/26/2024 COT - RSBU - Roof Nailing Passed 12-26-24, approved. Okay to continue construction.
01/30/2025 BULD - Electrical Clearance Passed 1/30/25 approval for TEP ECO
01/30/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/30/25 pass.
01/30/2025 COT - RSPL - Gas Pressure Test Passed 1/30/25 pass
02/07/2025 COT - RSBU - Interior Shear Bracing Passed Passed interior shear wall inspection 2/7/24 ok to tape
04/02/2025 COT - BULD - SWG Clearance Passed Passed CLEARANCE SWG 4/2/25
04/14/2025 RSBU - Building Progress Passed
04/14/2025 COT - RSEL - Electrical Final Passed
04/14/2025 COT - RSEL - Outdoor Lighting Passed
04/14/2025 COT - RSPL - Plumbing Final Passed
04/14/2025 ENGR Engineering Final Passed
04/16/2025 COT - RSME - Mechanical Final Passed 4/16/25
Pass
04/16/2025 RSBU - Building Final Passed 4/16/25
Pass

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-10-07_V1.PDF DOCUMENTS VIEW