Permit: TC-MDP-0424-00488
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9982 S ARNOLD RANCH CT
Address NEW:
9982 S ARNOLD RANCH CT
Apply Date:
04/22/2024
Applicant:
Description:
SFR RKK35L T21-M0084 REVISION-Structural changes
Permit Reviews
Permit Number - TC-MDP-0424-00488
Permit Status: Inspections complete
Permit Description: SFR RKK35L T21-M0084 REVISION-Structural changes
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00488
Permit Status: Inspections complete
Permit Description: SFR RKK35L T21-M0084 REVISION-Structural changes
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 04/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 04/29/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 04/29/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 04/29/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 04/29/2024 | Post-Tension Inspection Report is required. |
| 04/29/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0424-00488
Permit Status: Inspections complete
Permit Description: SFR RKK35L T21-M0084 REVISION-Structural changes
| Date | Description | Comments |
|---|---|---|
| 04/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/29/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00488
Permit Description: SFR RKK35L T21-M0084 REVISION-Structural changes
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/16/2024 | COT - RSPL - Sewer | Passed | ||
| 05/16/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 05/16/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 05/16/2024 | COT - RSPL - Rough Soil | Passed | ||
| 05/28/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 05/28/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 05/28/2024 | COT - RSBU - Preslab | Passed | ||
| 06/10/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 06/11/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 07/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of sheet rock and insulation. | |
| 07/24/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15 pounds of air pressure and holding without any leaks. Okay to proceed. | |
| 08/13/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 09/17/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 9/17/2024 | |
| 09/26/2024 | COT - BULD - SWG Clearance | Passed | PASSED SW GAS CLEARANCE 9/26/2024 | |
| 10/16/2024 | COT - RSEL - Electrical Final | Passed | Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
| 10/16/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/16/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
| 10/16/2024 | COT - RSME - Mechanical Final | Passed | Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
| 10/16/2024 | COT - RSPL - Plumbing Final | Passed | Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
| 10/16/2024 | ENGR Engineering Final | Passed | Site is designed to flow all to the front but there does not seam to be enough flow to do so. | |
| 10/16/2024 | RSBU - Building Final | Passed | Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
| 10/16/2024 | RSBU - Building Progress | Passed | Construction is completed per plans. Okay to issue Certificate of Occupancy. |