Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9841 E GRAY HAWK DR
Apply Date:
04/17/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442) REV1: Change to Elevation C.

Permit Reviews

Permit Number - TC-MDP-0424-00482
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442) REV1: Change to Elevation C.
Start Date Submittal Complete Date Status  
04/25/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/25/2025 REQUIRES RESUBMIT Review Details
02/07/2025 SITE FROM MODEL PERMIT - PRODUCTION REVISION v.1 02/14/2025 APPROVED Review Details
05/01/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 05/05/2025 APPROVED Review Details
04/18/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/24/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0424-00482
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442) REV1: Change to Elevation C.
Total Outstanding Activity Conditions - 1
Date Name
04/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0424-00482
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442) REV1: Change to Elevation C.
Date Description Comments
04/19/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/19/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/17/2024 Post-Tension Inspection Report is required.
04/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/19/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/19/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00482
Permite Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442) REV1: Change to Elevation C.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
03/18/2025 BULD - Electrical Clearance N/A Re-inspection required 18 March 25
1. Reinforcement not per plan.
2. Wrong address on Main panel.
03/18/2025 COT - RSBU - Excavation/Rebar/Zoning N/A Re-inspection required 18 March 25
1. Reinforcement not per plan.
2. Wrong address on Main panel.
03/18/2025 COT - RSBU - Preslab N/A Re-inspection required 18 March 25
1. Reinforcement not per plan.
2. Wrong address on Main panel.
04/10/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Install sills to secure cut cripples at balance grills

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00482
Permit Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442) REV1: Change to Elevation C.
Total Completed Inspections - 21
Date Description Inspector Results Comments
03/11/2025 COT - RSPL - Rough Soil Passed
03/11/2025 COT - RSPL - Sewer Passed
03/11/2025 COT - RSPL - Yard Water Line Passed
03/18/2025 COT - RSEL - Grounding/Bonding Passed
03/18/2025 COT - RSEL - Electrical Underground Passed
03/20/2025 BULD - Electrical Clearance Passed 20 March 25
TEP CLEARANCE: ECO
03/20/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
03/20/2025 COT - RSBU - Preslab Passed
03/27/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 27 March 25
Pass
03/27/2025 COT - RSBU - Roof Nailing Passed 27 March 25
Pass
04/10/2025 COT - RSPL - Gas Pressure Test Passed
04/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4/11/25 corrections made
04/24/2025 COT - RSBU - Interior Shear Bracing Passed Passed 4/24/25 ok to tape
05/28/2025 COT - BULD - SWG Clearance Passed 5/28/25
Southwest gas clearance: SWG
06/06/2025 COT - RSME - Mechanical Final Passed
06/06/2025 RSBU - Building Final Passed
06/06/2025 COT - RSEL - Outdoor Lighting Passed
06/06/2025 COT - RSPL - Plumbing Final Passed
06/06/2025 RSBU - Building Progress Passed
06/06/2025 COT - RSEL - Electrical Final Passed
06/06/2025 ENGR Engineering Final Passed Site is clean and clear. CofO ready.

Documents

File Name Document Type  
CDC 21 SIC-2025-04-28_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 21 REV1 D1_V1.PDF DOCUMENTS VIEW
CDC 21 REV1 NARRATIVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 21 SIC-2024-04-17_V1.PDF DOCUMENTS VIEW
CONS-CDC 21 D1_V1.PDF DOCUMENTS VIEW