Permit: TC-MDP-0424-00473
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9792 E GRAY HAWK DR
Address NEW:
9792 E GRAY HAWK DR
Apply Date:
04/17/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35B Plan
Permit Reviews
Permit Number - TC-MDP-0424-00473
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/19/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/02/2024 | APPROVED |
| 01/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/30/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00473
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0424-00473
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
| Date | Description | Comments |
|---|---|---|
| 04/19/2024 | Post-Installed Anchor Inspection Report is required. | |
| 04/17/2024 | Post-Tension Inspection Report is required. | |
| 04/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/19/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 04/19/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00473
Permite Description: Casas del Cerrito H35B Plan
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/26/2024 | COT - RSPL - Sewer | N/A | Not Ready | Not ready for inspection 11/26/24 |
| 11/26/2024 | COT - RSPL - Yard Water Line | N/A | Not Ready | Not ready for inspection 11/26/24 |
| 11/26/2024 | COT - RSPL - Rough Soil | N/A | Not Ready | Not ready for inspection 11/26/24 |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00473
Permit Description: Casas del Cerrito H35B Plan
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/27/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to main sewer line with green tracer wire attached. }Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 11/27/2024 | COT - RSPL - Yard Water Line | Passed | Water is installed in trench and connected to the water meter. Line is under street pressure with no leaks. Okay to shade pipe and backfill trench. | |
| 11/27/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is connected to main sewer line with green tracer wire attached. }Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 12/20/2024 | COT - RSBU - Roof Nailing | Passed | Per code and plans 12/20/24 | |
| 12/20/2024 | BULD - Electrical Clearance | Passed | Passed ready for temp power CLEARANCE ECO | |
| 12/20/2024 | COT - RSEL - Electrical Underground | Passed | Passed by Tom prior to slab | |
| 12/20/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed by Tom prior to slab | |
| 12/20/2024 | COT - RSBU - Preslab | Passed | Passed by Tom | |
| 01/09/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 01/07/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to proceed 1/7/25 | |
| 01/07/2025 | COT - RSPL - Gas Pressure Test | Passed | Ok to proceed 1/7/25 | |
| 01/17/2025 | COT - RSBU - Interior Shear Bracing | Passed | 1/17/25: Drywall for interior shear walls is properly secured to studs per plan requirements. | |
| 02/27/2025 | COT - BULD - SWG Clearance | Passed | 2-27-25, SWG clearance inspection approved. Okay for SWG to install service-Clearance issued | |
| 02/27/2025 | COT - RSEL - Grounding/Bonding | Passed | 2-27-25, grounding/bonding approved | |
| 03/06/2025 | COT - RSEL - Electrical Final | Passed | Passed final 3/6/25 clearance eco | |
| 03/06/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 3/6/25 | |
| 03/06/2025 | COT - RSME - Mechanical Final | Passed | Passed final 3/6/25 | |
| 03/06/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 3/6/25 | |
| 03/06/2025 | RSBU - Building Final | Passed | Passed final 3/6/25 | |
| 03/06/2025 | RSBU - Building Progress | Passed | Passed final 3/6/25 | |
| 07/29/2025 | ENGR Engineering Final | Passed | Site is clean and clear. Everything is completed per plans. |