Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9792 E GRAY HAWK DR
Apply Date:
04/17/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35B Plan

Permit Reviews

Permit Number - TC-MDP-0424-00473
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
Start Date Submittal Complete Date Status  
04/19/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/02/2024 APPROVED Review Details
01/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/30/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0424-00473
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
Total Outstanding Activity Conditions - 1
Date Name
04/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0424-00473
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
Date Description Comments
04/19/2024 Post-Installed Anchor Inspection Report is required.
04/17/2024 Post-Tension Inspection Report is required.
04/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/19/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
04/19/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00473
Permite Description: Casas del Cerrito H35B Plan
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
11/26/2024 COT - RSPL - Sewer N/A Not Ready Not ready for inspection 11/26/24
11/26/2024 COT - RSPL - Yard Water Line N/A Not Ready Not ready for inspection 11/26/24
11/26/2024 COT - RSPL - Rough Soil N/A Not Ready Not ready for inspection 11/26/24

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00473
Permit Description: Casas del Cerrito H35B Plan
Total Completed Inspections - 21
Date Description Inspector Results Comments
11/27/2024 COT - RSPL - Sewer Passed Underground plumbing is connected to main sewer line with green tracer wire attached. }Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches.
11/27/2024 COT - RSPL - Yard Water Line Passed Water is installed in trench and connected to the water meter. Line is under street pressure with no leaks. Okay to shade pipe and backfill trench.
11/27/2024 COT - RSPL - Rough Soil Passed Underground plumbing is connected to main sewer line with green tracer wire attached. }Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches.
12/20/2024 COT - RSBU - Roof Nailing Passed Per code and plans 12/20/24
12/20/2024 BULD - Electrical Clearance Passed Passed ready for temp power CLEARANCE ECO
12/20/2024 COT - RSEL - Electrical Underground Passed Passed by Tom prior to slab
12/20/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Passed by Tom prior to slab
12/20/2024 COT - RSBU - Preslab Passed Passed by Tom
01/09/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
01/07/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Ok to proceed 1/7/25
01/07/2025 COT - RSPL - Gas Pressure Test Passed Ok to proceed 1/7/25
01/17/2025 COT - RSBU - Interior Shear Bracing Passed 1/17/25: Drywall for interior shear walls is properly secured to studs per plan requirements.
02/27/2025 COT - BULD - SWG Clearance Passed 2-27-25, SWG clearance inspection approved. Okay for SWG to install service-Clearance issued
02/27/2025 COT - RSEL - Grounding/Bonding Passed 2-27-25, grounding/bonding approved
03/06/2025 COT - RSEL - Electrical Final Passed Passed final 3/6/25 clearance eco
03/06/2025 COT - RSEL - Outdoor Lighting Passed Passed final 3/6/25
03/06/2025 COT - RSME - Mechanical Final Passed Passed final 3/6/25
03/06/2025 COT - RSPL - Plumbing Final Passed Passed final 3/6/25
03/06/2025 RSBU - Building Final Passed Passed final 3/6/25
03/06/2025 RSBU - Building Progress Passed Passed final 3/6/25
07/29/2025 ENGR Engineering Final Passed Site is clean and clear. Everything is completed per plans.

Documents

File Name Document Type  
CDC 34 SIC-2025-01-28_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 34 SIC-2024-04-18_V1.PDF DOCUMENTS VIEW
CONS-CDC 34 D1_V1.PDF DOCUMENTS VIEW