Permit: TC-MDP-0424-00472
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9810 E GRAY HAWK DR
Address NEW:
9810 E GRAY HAWK DR
Apply Date:
04/17/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35B Plan
Permit Reviews
Permit Number - TC-MDP-0424-00472
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/25/2025 | APPROVED |
| 02/11/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/13/2025 | REQUIRES RESUBMIT |
| 04/19/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/02/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00472
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 04/19/2024 | Post-Installed Anchor Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0424-00472
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
| Date | Description | Comments |
|---|---|---|
| 04/17/2024 | Post-Tension Inspection Report is required. | |
| 04/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/19/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 04/19/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00472
Permite Description: Casas del Cerrito H35B Plan
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2025 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Applicable | Duplicate, passed by Fernando 12/30/24 |
| 01/10/2025 | COT - RSEL - Grounding/Bonding | N/A | Not Applicable | Duplicate, passed by Fernando 12/30/24 |
| 12/30/2024 | COT - RSEL - Electrical Underground | N/A | Partial Pass | 12-30-24, partial pass for ufer. |
| 04/09/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 4-9-25, paint all exterior plastic, install stove/cooktop and dishwasher. |
| 04/09/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 4-9-25, paint all exterior plastic, install stove/cooktop and dishwasher. |
| 04/09/2025 | RSBU - Building Final | N/A | Re-inspection required | 4-9-25, paint all exterior plastic, install stove/cooktop and dishwasher. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00472
Permit Description: Casas del Cerrito H35B Plan
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2024 | COT - RSPL - Rough Soil | Passed | Per plans, ok to backfill 12/20/24 | |
| 12/20/2024 | COT - RSPL - Sewer | Passed | Per plans, ok to backfill 12/20/24 | |
| 12/20/2024 | COT - RSPL - Yard Water Line | Passed | Per plans, ok to backfill 12/20/24 | |
| 12/30/2024 | COT - RSBU - Preslab | Passed | 12-30-24, preslab approved. Okay to pour concrete. | |
| 01/10/2025 | BULD - Electrical Clearance | Passed | 1/10/25 ready for temp power CLEARANCE ECO | |
| 01/10/2025 | COT - RSEL - Electrical Underground | Passed | 1/10/25 passed | |
| 01/13/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1/13/25: All issues from other inspection have been resolved and corrected. Okay to proceed with other work. | |
| 01/13/2025 | COT - RSBU - Roof Nailing | Passed | 1/13/25: All issues from other inspection have been resolved and corrected. Okay to proceed with other work. | |
| 01/24/2025 | COT - RSPL - Gas Pressure Test | Passed | Gas line is holding 15 psi of air pressure. Okay to proceed with other work. | |
| 01/28/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1/28/25 roof has been loaded. passed inspection | |
| 01/28/2025 | RSBU - Building Progress | Passed | ||
| 02/06/2025 | COT - RSBU - Interior Shear Bracing | Passed | 2-6-25, interior shear bracing inspection approved plans. Okay to tape & texture drywall. | |
| 04/02/2025 | COT - BULD - SWG Clearance | Passed | Approved for gas meter - SWG Clearance is required | |
| 04/09/2025 | COT - RSEL - Electrical Final | Passed | 4-9-25, outdoor lighting & electrical final approved. | |
| 04/09/2025 | COT - RSEL - Outdoor Lighting | Passed | 4-9-25, outdoor lighting & electrical final approved. | |
| 04/15/2025 | COT - RSME - Mechanical Final | Passed | 4-15-25, mechanical final inspection approved. | |
| 04/15/2025 | COT - RSPL - Plumbing Final | Passed | 4-15-25, plumbing & building final approved. | |
| 04/15/2025 | RSBU - Building Final | Passed | 4-15-25, plumbing & building final approved. | |
| 04/22/2025 | ENGR Engineering Final | Passed |