Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9805 E GRAY HAWK DR
Apply Date:
04/17/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35B Plan

Permit Reviews

Permit Number - TC-MDP-0424-00471
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
Start Date Submittal Complete Date Status  
02/19/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/24/2025 APPROVED Review Details
04/18/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/24/2024 APPROVED Review Details
02/11/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/13/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0424-00471
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
Total Outstanding Activity Conditions - 1
Date Name
04/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0424-00471
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
Date Description Comments
04/19/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/19/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/17/2024 Post-Tension Inspection Report is required.
04/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/19/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/19/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00471
Permite Description: Casas del Cerrito H35B Plan
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/28/2025 COT - BULD - SWG Clearance N/A Re-inspection required 28 FEB 25
Not ready, missing isolation valves.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00471
Permit Description: Casas del Cerrito H35B Plan
Total Completed Inspections - 22
Date Description Inspector Results Comments
12/06/2024 COT - RSPL - Backwater Valve Passed 12/6/24 pass ok to backfill, shading required
12/06/2024 COT - RSPL - Rough Soil Passed 12/6/24 pass ok to backfill, shading required
12/06/2024 COT - RSPL - Sewer Passed 12/6/24 pass ok to backfill, shading required
12/06/2024 COT - RSPL - Yard Water Line Passed 12/6/24 pass ok to backfill, shading required
12/16/2024 BULD - Electrical Clearance Passed 12/16/24 TEP clearance code: ECO
12/16/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 12/16/24 pass
12/16/2024 COT - RSBU - Preslab Passed 12/16/24 pass
12/16/2024 COT - RSEL - Electrical Underground Passed 12/16/24 pass
12/16/2024 COT - RSEL - Grounding/Bonding Passed 12/16/24 pass
12/30/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 12-30-24, exterior clips/sheathing approved. Okay to continue construction.
12/30/2024 COT - RSBU - Roof Nailing Passed 12-30-24, roof nailing approved.
01/17/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, plumbing, and electrical rough-in are complete. Okay to proceed with installation of insulation and drywall.
01/17/2025 COT - RSPL - Gas Pressure Test Passed Gas lines are under 15 psi with no leaks. Okay to proceed with further work.
01/28/2025 COT - RSBU - Interior Shear Bracing Passed 1/28/25 pass
03/04/2025 COT - BULD - SWG Clearance Passed Southwest gas clearance: SWG
03/19/2025 COT - RSEL - Outdoor Lighting Passed 3/19/25 passed
03/19/2025 COT - RSPL - Plumbing Final Passed 3/19/25 passed
03/19/2025 RSBU - Building Progress Passed 3/19/25 passed
03/19/2025 ENGR Engineering Final Passed
03/21/2025 COT - RSEL - Electrical Final Passed 2/21/25 corrections made
03/21/2025 COT - RSME - Mechanical Final Passed 2/21/25 corrections made
03/21/2025 RSBU - Building Final Passed 2/21/25 corrections made

Documents

File Name Document Type  
CDC 15 SIC-2025-02-10_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 15 SIC-2024-04-17_V1.PDF DOCUMENTS VIEW
CONS-CDC 15 D1_V1.PDF DOCUMENTS VIEW