Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0424-00467
Permit Details
Apply Date:
04/22/2024
Applicant:
Joshua Swinney
Description:
Arches Model Plan
Permit Reviews
Permit Number - TC-MDP-0424-00467
Permit Status: Issued
Permit Description: Arches Model Plan
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00467
Permit Status: Issued
Permit Description: Arches Model Plan
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
04/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
04/26/2024 | Post-Installed Anchor Inspection Report is required. |
04/26/2024 | Post-Tension Inspection Report is required. |
04/26/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0424-00467
Permit Status: Issued
Permit Description: Arches Model Plan
Date | Description | Comments |
---|---|---|
05/01/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
04/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/26/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0424-00467
Permite Description: Arches Model Plan
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/28/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
10/28/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
10/28/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 10/28/24: seal all sleeves under slab at kitchen area, receptacle missing per plans at laundry room, Shower not under test at 2nd floor, please provide approved wiring drawings from Austin electrical, circuits at main panel don't match approved plans, seal all penetrations through 2nd floor decking under tubs and throughout. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0424-00467
Permit Description: Arches Model Plan
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/11/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/17/2024 | COT - RSPL - Rough Soil | Passed | 6/17/24: Green tracer wire has been installed on underground plumbing clean out to sewer connection. | |
06/25/2024 | COT - RSEL - Electrical Underground | Passed | ||
06/25/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
06/26/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/26/2024 | COT - RSBU - Preslab | Passed | ||
08/02/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | All shear walls are properly secured to concrete floor with shear brackets with titan bolts and properly plywood sheathing is properly secured to studs per plan. All interior and exterior wall bottom plates are secured to concrete floor with red heads, masa clips, or titan bolts. Okay to proceed with rough in. | |
08/02/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is properly secured to roof trusses with nails and staples. Okay to proceed with rough-in. | |
10/16/2024 | COT - RSPL - Sewer | Passed | DWV Pipes are connected to the main sewer line and under water pressure test with no leaks. |