Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Address:
9647 E HARKES DR
Apply Date:
04/22/2024
Applicant:
Joshua Swinney
Description:
Arches Model Plan

Permit Reviews

Permit Number - TC-MDP-0424-00467
Permit Status: Issued
Permit Description: Arches Model Plan
Start Date Submittal Complete Date Status  
04/26/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0424-00467
Permit Status: Issued
Permit Description: Arches Model Plan
Total Outstanding Activity Conditions - 4
Date Name
04/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/26/2024 Post-Installed Anchor Inspection Report is required.
04/26/2024 Post-Tension Inspection Report is required.
04/26/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0424-00467
Permit Status: Issued
Permit Description: Arches Model Plan
Date Description Comments
05/01/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
04/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/26/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0424-00467
Permite Description: Arches Model Plan
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/28/2024 COT - BULD - SWG Clearance N/A Not Applicable
10/28/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable
10/28/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 10/28/24: seal all sleeves under slab at kitchen area, receptacle missing per plans at laundry room, Shower not under test at 2nd floor, please provide approved wiring drawings from Austin electrical, circuits at main panel don't match approved plans, seal all penetrations through 2nd floor decking under tubs and throughout.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0424-00467
Permit Description: Arches Model Plan
Total Completed Inspections - 9
Date Description Inspector Results Comments
06/11/2024 COT - RSPL - Yard Water Line Passed
06/17/2024 COT - RSPL - Rough Soil Passed 6/17/24: Green tracer wire has been installed on underground plumbing clean out to sewer connection.
06/25/2024 COT - RSEL - Electrical Underground Passed
06/25/2024 COT - RSEL - Grounding/Bonding Passed
06/26/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/26/2024 COT - RSBU - Preslab Passed
08/02/2024 COT - RSBU - Exterior Clips/Sheathing Passed All shear walls are properly secured to concrete floor with shear brackets with titan bolts and properly plywood sheathing is properly secured to studs per plan. All interior and exterior wall bottom plates are secured to concrete floor with red heads, masa clips, or titan bolts. Okay to proceed with rough in.
08/02/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is properly secured to roof trusses with nails and staples. Okay to proceed with rough-in.
10/16/2024 COT - RSPL - Sewer Passed DWV Pipes are connected to the main sewer line and under water pressure test with no leaks.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 61 PLOT PLAN_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 61 SIC-2024-04-22_V1.PDF DOCUMENTS VIEW