Permit: TC-MDP-0424-00457
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9769 E GRAY HAWK DR
Address NEW:
9769 E GRAY HAWK DR
Apply Date:
04/19/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito 3542 Model Plan
Permit Reviews
Permit Number - TC-MDP-0424-00457
Permit Status: Inspections complete
Permit Description: Casas del Cerrito 3542 Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/17/2024 | APPROVED |
| 04/19/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 05/02/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00457
Permit Status: Inspections complete
Permit Description: Casas del Cerrito 3542 Model Plan
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0424-00457
Permit Status: Inspections complete
Permit Description: Casas del Cerrito 3542 Model Plan
| Date | Description | Comments |
|---|---|---|
| 04/19/2024 | Post-Installed Anchor Inspection Report is required. | |
| 04/17/2024 | Post-Tension Inspection Report is required. | |
| 04/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/19/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00457
Permit Description: Casas del Cerrito 3542 Model Plan
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2024 | COT - RSPL - Rough Soil | Passed | ||
| 05/21/2024 | COT - RSPL - Sewer | Passed | ||
| 05/21/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 05/31/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and ground wire and rods are properly installed in bottom of footer. Okay to proceed with concrete pour. | |
| 05/31/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and ground wire and rods are properly installed in bottom of footer. Okay to proceed with concrete pour. | |
| 05/31/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and ground wire and rods are properly installed in bottom of footer. Okay to proceed with concrete pour. | |
| 05/31/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and ground wire and rods are properly installed in bottom of footer. Okay to proceed with concrete pour. | |
| 06/14/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 06/17/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 6/17/24: Anchor bolts and shot pins have been installed. Okay to proceed with rough-in of mechanical, electrical, and plumbing work. | |
| 07/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation. | |
| 07/05/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas lines are holding 15 pounds of air. Okay to proceed. | |
| 07/18/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 08/27/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
| 09/11/2024 | COT - RSEL - Electrical Final | Passed | Construction is completed. Okay to issue Certificate of Occupancy. | |
| 09/11/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed and operational per plan and city requirements. | |
| 09/11/2024 | COT - RSME - Mechanical Final | Passed | Construction is completed. Okay to issue Certificate of Occupancy. | |
| 09/11/2024 | COT - RSPL - Plumbing Final | Passed | Construction is completed. Okay to issue Certificate of Occupancy. | |
| 09/11/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 09/11/2024 | ENGR Engineering Final | Passed | ||
| 09/11/2024 | RSBU - Building Final | Passed | Construction is completed. Okay to issue Certificate of Occupancy. | |
| 09/11/2024 | RSBU - Building Progress | Passed | Construction is completed. Okay to issue Certificate of Occupancy. |