Permit: TC-MDP-0424-00432
Permit Details
Apply Date:
02/06/2023
Applicant:
Daria Hopkins
Description:
SFR MER1402190 T21-M0078
Permit Reviews
Permit Number - TC-MDP-0424-00432
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/02/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/09/2024 | APPROVED |
10/08/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/08/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0424-00432
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Date | Description | Comments |
---|---|---|
05/02/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
05/02/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
05/02/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/02/2024 | Post-Tension Inspection Report is required. | |
04/12/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/12/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
05/02/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0424-00432
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/21/2024 | COT - RSPL - Yard Water Line | Passed | ||
08/21/2024 | COT - RSPL - Sewer | Passed | ||
08/21/2024 | COT - RSPL - Rough Soil | Passed | ||
08/29/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/29/2024 | COT - RSBU - Preslab | Passed | ||
08/29/2024 | COT - RSEL - Electrical Underground | Passed | ||
09/24/2024 | COT - RSBU - Roof Nailing | Passed | 9/24/24 Corrections made | |
09/25/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 9/25/24: Corrections have been made. Okay to proceed with rough-in. | |
10/18/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15# psi with no leaks. Okay to proceed. | |
10/18/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
10/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Rough-in is complete. Okay to proceed with insulation and drywall installation. | |
10/18/2024 | RSBU - Building Progress | Passed | ||
11/01/2024 | COT - RSBU - Interior Shear Bracing | Passed |