Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
04/12/2024
Applicant:
Daria Hopkins
Description:
SFR MER1402190 T21-M0078

Permit Reviews

Permit Number - TC-MDP-0424-00431
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Start Date Submittal Complete Date Status  
05/24/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/28/2024 APPROVED Review Details
09/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/18/2024 APPROVED Review Details
04/15/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/22/2024 APPROVED Review Details
07/19/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/31/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0424-00431
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Date Description Comments
04/18/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/18/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/18/2024 Post-Tension Inspection Report is required.
04/12/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/12/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
09/18/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/18/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0424-00431
Permite Description: SFR MER1402190 T21-M0078
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
10/10/2024 COT - RSBU - Interior Shear Bracing N/A Not Ready 10/10/24 Intermediate inspection needs to be closed out before shear wall inspection.
09/27/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required
11/25/2024 COT - BULD - SWG Clearance N/A Re-inspection required Install vent cap on water heater
12/19/2024 COT - RSEL - Electrical Final N/A Re-inspection required 12-19-24, no access, property locked.
12/19/2024 COT - RSEL - Outdoor Lighting N/A Re-inspection required 12-19-24, no access, property locked.
12/19/2024 COT - RSME - Mechanical Final N/A Re-inspection required 12-19-24, no access, property locked.
12/19/2024 COT - RSPL - Plumbing Final N/A Re-inspection required 12-19-24, no access, property locked.
12/19/2024 RSBU - Building Final N/A Re-inspection required 12-19-24, no access. Property locked.
12/19/2024 RSBU - Building Progress N/A Re-inspection required 12-19-24, no access, property locked.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0424-00431
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 14
Date Description Inspector Results Comments
07/25/2024 COT - RSPL - Yard Water Line Passed
07/25/2024 COT - RSPL - Sewer Passed
07/25/2024 COT - RSPL - Rough Soil Passed
08/06/2024 COT - RSBU - Preslab Passed
08/06/2024 COT - RSEL - Electrical Underground Passed
08/06/2024 COT - RSEL - Grounding/Bonding Passed
08/06/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/26/2024 COT - RSBU - Exterior Clips/Sheathing Passed
08/26/2024 COT - RSBU - Roof Nailing Passed
09/27/2024 BULD - Electrical Clearance Passed
09/27/2024 COT - RSPL - Gas Pressure Test Passed
10/11/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10/11/24: DWV has passed. Mechanical, electrical, and plumbing rough in is complete okay to proceed.
11/27/2024 COT - BULD - SWG Clearance Passed Gas valves are installed on all gas pipes for gas appliance locations. SWG Clearance issued.
12/13/2024 ENGR Engineering Final Passed Construction Materials are getting cleaned up now.
Missing yard gate will be installed and finished well before closing. Otherwise passes.

Scheduled Inspections

Scheduled Inspections - TC-MDP-0424-00431
Status: Issued
Description: SFR MER1402190 T21-M0078
Scheduled Date Description Entered By Entered Date
12/23/2024 COT - RSEL - Electrical Final Scheduled
12/23/2024 RSBU - Building Progress Scheduled
12/23/2024 COT - RSEL - Outdoor Lighting Scheduled
12/23/2024 COT - RSPL - Plumbing Final Scheduled
12/23/2024 COT - RSME - Mechanical Final Scheduled
12/23/2024 RSBU - Building Final Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
149378 PT LOT 56 COMPLETE-2024-09-17_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 56 PLOT PLAN REVISED 7.17.24_V1.PDF DOCUMENTS VIEW
TC-MDP-0424-00431 REVISION 7.17.24_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 56 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 56 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 56 SPECIAL INSPECTION CERTIFICATE-2024-04-12_V1.PDF DOCUMENTS VIEW