Permit: TC-MDP-0424-00427
Permit Details
Apply Date:
04/10/2023
Applicant:
Daria Hopkins
Description:
SFR MER1502580 T21-M0076 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0424-00427
Permit Status: Inspections complete
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/18/2024 | APPROVED |
09/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/16/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00427
Permit Status: Inspections complete
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
04/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0424-00427
Permit Status: Inspections complete
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Date | Description | Comments |
---|---|---|
04/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
04/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
04/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/15/2024 | Post-Tension Inspection Report is required. | |
04/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00427
Permite Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/07/2024 | COT - RSBU - Interior Shear Bracing | N/A | Re-inspection required | 10-7-24,interior shear walls not installed per approved plans. Missing nailing throughout shear walls. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00427
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/25/2024 | COT - RSPL - Rough Soil | Passed | ||
07/25/2024 | COT - RSPL - Sewer | Passed | ||
07/25/2024 | COT - RSPL - Yard Water Line | Passed | ||
07/31/2024 | COT - RSBU - Preslab | Passed | ||
07/31/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
07/31/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/31/2024 | COT - RSEL - Electrical Underground | Passed | ||
08/22/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
08/23/2024 | COT - RSBU - Roof Nailing | Passed | 8/23/24: Roof sheathing at garage and hallway garage entry has been properly secured to trusses. Okay to proceed with rough-in. | |
09/17/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/24/2024 | BULD - Electrical Clearance | Passed | ||
09/25/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 9/25/24: Corrections have been made. Okay to proceed with insulation and drywall installation. | |
10/08/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
11/21/2024 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 11/21/2024 | |
12/11/2024 | COT - RSEL - Electrical Final | Passed | 12-11-24, electrical final approved.. | |
12/11/2024 | COT - RSEL - Outdoor Lighting | Passed | 12-11-24, outdoor lighting final approved.. | |
12/11/2024 | COT - RSPL - Plumbing Final | Passed | 12-11-24, plumbing final approved.. | |
12/11/2024 | RSBU - Building Progress | Passed | ||
12/12/2024 | ENGR Engineering Final | Passed | ||
12/12/2024 | COT - RSME - Mechanical Final | Passed | 12-12-24, mechanical and building finals approved. | |
12/12/2024 | RSBU - Building Final | Passed | 12-12-24, mechanical and building finals approved. |