Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6045 E CAMPOLINA TR
Apply Date:
04/03/2024
Applicant:
Brian Jones
Description:
Blackhawk T936 - Palm

Permit Reviews

Permit Number - TC-MDP-0424-00394
Permit Status: Complete
Permit Description: Blackhawk T936 - Palm
Start Date Submittal Complete Date Status  
04/12/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.2 04/16/2024 APPROVED Review Details
03/05/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/07/2025 REQUIRES RESUBMIT Review Details
04/16/2024 RESTAMP - RESIDENTIAL v.1 04/17/2024 APPROVED Review Details
04/03/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 04/03/2025 APPROVED Review Details
04/04/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 04/11/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0424-00394
Permit Status: Complete
Permit Description: Blackhawk T936 - Palm
Date Description Comments
04/11/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/11/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/11/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/02/2024 Post-Tension Inspection Report is required.
04/02/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/02/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/11/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00394
Permit Description: Blackhawk T936 - Palm
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/30/2024 COT - RSPL - Rough Soil Passed
05/30/2024 COT - RSPL - Sewer Passed
05/30/2024 COT - RSPL - Yard Water Line Passed
06/11/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/11/2024 COT - RSBU - Preslab Passed
06/11/2024 COT - RSEL - Electrical Underground Passed
06/26/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
06/26/2024 COT - RSBU - Roof Nailing Passed
08/02/2024 COT - RSEL - Grounding/Bonding Passed
08/02/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 8/2/2024
08/02/2024 COT - RSPL - Gas Pressure Test Passed
08/06/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections were made. 8/6/2024
08/16/2024 COT - RSBU - Interior Shear Bracing Passed
09/09/2024 RSBU - Building Progress Passed rebar, mesh and footer for entry per plan. okay for concrete placement. 9/9/2024
10/08/2024 ENGR Engineering Final Passed
10/15/2024 COT - BULD - SWG Clearance Passed Passed SW GAS CLEARANCE 10/15/24
10/15/2024 COT - RSPL - Plumbing Final Passed PASSED 10/15/24
10/15/2024 COT - RSEL - Outdoor Lighting Passed Passed 10/15/24
10/17/2024 COT - RSEL - Electrical Final Passed Passed 10/17/24 CLEARANCE ECO
10/17/2024 COT - RSME - Mechanical Final Passed Passed 10/17/24
10/22/2024 RSBU - Building Final Passed PASSED FINAL INSPECTION 10/22/24