Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0424-00388
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6053 E CAMPOLINA TR
Address NEW:
6053 E CAMPOLINA TR
Apply Date:
04/03/2024
Applicant:
Brian Jones
Description:
Blackhawk T933 - Beech
Permit Reviews
Permit Number - TC-MDP-0424-00388
Permit Status: Complete
Permit Description: Blackhawk T933 - Beech
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 04/18/2024 | APPROVED |
| 04/04/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/09/2024 | REQUIRES RESUBMIT |
| 04/07/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 04/14/2025 | APPROVED |
| 03/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/10/2025 | REQUIRES RESUBMIT |
| 04/18/2024 | RESTAMP - RESIDENTIAL v.1 | 04/18/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0424-00388
Permit Status: Complete
Permit Description: Blackhawk T933 - Beech
| Date | Description | Comments |
|---|---|---|
| 04/01/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 04/08/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 04/08/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 04/01/2024 | Post-Tension Inspection Report is required. | |
| 04/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 04/08/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0424-00388
Permit Description: Blackhawk T933 - Beech
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/30/2024 | COT - RSPL - Rough Soil | Passed | ||
| 05/30/2024 | COT - RSPL - Sewer | Passed | ||
| 05/30/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 06/11/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/11/2024 | COT - RSBU - Preslab | Passed | ||
| 06/11/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 07/01/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 07/01/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/06/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 8/6/2024 | |
| 08/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/06/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/06/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 08/16/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 09/04/2024 | RSBU - Building Progress | Passed | reinforcement at entry per plan. okay for concrete placement. 9/4/2024 | |
| 11/14/2024 | COT - RSEL - Outdoor Lighting | Passed | 11-14-24, approved. | |
| 11/14/2024 | ENGR Engineering Final | Passed | CO Ready | |
| 11/15/2024 | COT - BULD - SWG Clearance | Passed | 11-15-24, approved for Southwest gas connection. | |
| 11/25/2024 | COT - RSEL - Electrical Final | Passed | 11-25-24, plumbing & electrical final approved. | |
| 11/25/2024 | COT - RSPL - Plumbing Final | Passed | 11-25-24, plumbing final approved. | |
| 11/27/2024 | COT - RSME - Mechanical Final | Passed | 11-27-24, building final approved. | |
| 11/27/2024 | RSBU - Building Final | Passed | 11-27-24, building final approved. |