Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0424-00388
Permit Details
Apply Date:
04/03/2024
Applicant:
Paula Hinman
Description:
Blackhawk T933 - Beech
Permit Reviews
Permit Number - TC-MDP-0424-00388
Permit Status: Inspections complete
Permit Description: Blackhawk T933 - Beech
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 04/18/2024 | APPROVED |
04/04/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/09/2024 | REQUIRES RESUBMIT |
04/18/2024 | RESTAMP - RESIDENTIAL v.1 | 04/18/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00388
Permit Status: Inspections complete
Permit Description: Blackhawk T933 - Beech
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
04/01/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
04/01/2024 | Post-Tension Inspection Report is required. |
04/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
04/08/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
04/08/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0424-00388
Permit Status: Inspections complete
Permit Description: Blackhawk T933 - Beech
Date | Description | Comments |
---|---|---|
04/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/08/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00388
Permit Description: Blackhawk T933 - Beech
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/30/2024 | COT - RSPL - Rough Soil | Passed | ||
05/30/2024 | COT - RSPL - Sewer | Passed | ||
05/30/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/11/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/11/2024 | COT - RSBU - Preslab | Passed | ||
06/11/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/01/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/01/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
08/06/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 8/6/2024 | |
08/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
08/06/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
08/06/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/16/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
09/04/2024 | RSBU - Building Progress | Passed | reinforcement at entry per plan. okay for concrete placement. 9/4/2024 | |
11/14/2024 | COT - RSEL - Outdoor Lighting | Passed | 11-14-24, approved. | |
11/14/2024 | ENGR Engineering Final | Passed | CO Ready | |
11/15/2024 | COT - BULD - SWG Clearance | Passed | 11-15-24, approved for Southwest gas connection. | |
11/25/2024 | COT - RSEL - Electrical Final | Passed | 11-25-24, plumbing & electrical final approved. | |
11/25/2024 | COT - RSPL - Plumbing Final | Passed | 11-25-24, plumbing final approved. | |
11/27/2024 | COT - RSME - Mechanical Final | Passed | 11-27-24, building final approved. | |