Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0424-00387
Permit Details
Apply Date:
04/03/2024
Applicant:
Varnado Standifer
Description:
Blackhawk T933 - Beech
Permit Reviews
Permit Number - TC-MDP-0424-00387
Permit Status: Inspections complete
Permit Description: Blackhawk T933 - Beech
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 05/01/2024 | APPROVED |
04/23/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/23/2024 | REQUIRES RESUBMIT |
04/18/2024 | RESTAMP - RESIDENTIAL v.1 | 04/18/2024 | APPROVED |
04/04/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/09/2024 | REQUIRES RESUBMIT |
04/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 04/18/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00387
Permit Status: Inspections complete
Permit Description: Blackhawk T933 - Beech
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
04/01/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
04/01/2024 | Post-Tension Inspection Report is required. |
04/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
04/08/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
04/08/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0424-00387
Permit Status: Inspections complete
Permit Description: Blackhawk T933 - Beech
Date | Description | Comments |
---|---|---|
04/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/08/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00387
Permite Description: Blackhawk T933 - Beech
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/22/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Partial Pass | Partial pending 2 x 4's at one end back patio along with an h25 clip. Rest of items have been corrected. Okay to proceed with lath pending area that needs to be seen. 7/22/2024 |
10/01/2024 | COT - BULD - SWG Clearance | N/A | Not Ready | Not ready, plate at bottom of circuit needs to be put in, receptacles in kitchen need to be mounted, plumbing fixtures in bathrooms need to be installed. No hot water heater . NOT READY 10/01/2024 |
10/01/2024 | COT - RSEL - Electrical Final | N/A | Not Ready | Not ready, plate at bottom of circuit needs to be put in, receptacles in kitchen need to be mounted, plumbing fixtures in bathrooms need to be installed. No hot water heater . NOT READY 10/01/2024 |
10/01/2024 | COT - RSME - Mechanical Final | N/A | Not Ready | Not ready, plate at bottom of circuit needs to be put in, receptacles in kitchen need to be mounted, plumbing fixtures in bathrooms need to be installed. No hot water heater . NOT READY 10/01/2024 |
10/01/2024 | COT - RSPL - Plumbing Final | N/A | Not Ready | Not ready, plate at bottom of circuit needs to be put in, receptacles in kitchen need to be mounted, plumbing fixtures in bathrooms need to be installed. No hot water heater . NOT READY 10/01/2024 |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00387
Permit Description: Blackhawk T933 - Beech
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/06/2024 | COT - RSPL - Rough Soil | Passed | ||
06/06/2024 | COT - RSPL - Sewer | Passed | ||
06/13/2024 | COT - RSBU - Preslab | Passed | ||
06/13/2024 | COT - RSEL - Electrical Underground | Passed | ||
06/13/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/13/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/22/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/23/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Corrections were made. 7/23/2024 | |
08/26/2024 | BULD - Electrical Clearance | Passed | clearance for TEP ECO. 8/26/2024 | |
08/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
08/26/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
08/26/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/10/2024 | COT - RSBU - Interior Shear Bracing | Passed | Passed shear wall inspection 9//10/2024 | |
09/26/2024 | RSBU - Building Progress | Passed | front entry reinforcement and footer per plan. okay for concrete placement. 9/26/2024 | |
11/14/2024 | ENGR Engineering Final | Passed | CO Ready | |
11/14/2024 | COT - RSEL - Outdoor Lighting | Passed | 11-14-24, outdoor lighting final approved. | |
11/14/2024 | COT - BULD - SWG Clearance | Passed | 11-14-24, listed above items have been corrected. Approved for Southwest gas clearance | |
11/15/2024 | COT - RSEL - Electrical Final | Passed | 11-15-24, listed items from previous inspection have been corrected. Electrical final approved | |
11/15/2024 | COT - RSME - Mechanical Final | Passed | 11-15-24, listed items from previous inspection have been corrected. Mechanical final approved. | |
11/15/2024 | COT - RSPL - Plumbing Final | Passed | 11-15-24, listed items from previous inspection have been corrected. Plumbing final approved. | |
11/25/2024 | RSBU - Building Final | Passed | 11-25-24, building final approved. |