Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
4783 E JULIAN WASH DR
Apply Date:
04/04/2024
Applicant:
Dana Petty
Description:
SFR MERI192021 T21-M0064

Permit Reviews

Permit Number - TC-MDP-0424-00384
Permit Status: Complete
Permit Description: SFR MERI192021 T21-M0064
Start Date Submittal Complete Date Status  
01/23/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 01/24/2025 REQUIRES RESUBMIT Review Details
02/04/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.4 02/05/2025 APPROVED Review Details
04/04/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/09/2024 APPROVED Review Details
01/31/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.3 02/03/2025 REQUIRES RESUBMIT Review Details
10/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/10/2024 APPROVED Review Details
01/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/22/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0424-00384
Permit Status: Complete
Permit Description: SFR MERI192021 T21-M0064
Date Description Comments
04/05/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/05/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/21/2025 Post-Installed Anchor Inspection Report is required.
04/05/2024 Post-Tension Inspection Report is required.
04/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/05/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/05/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00384
Permit Description: SFR MERI192021 T21-M0064
Total Completed Inspections - 22
Date Description Inspector Results Comments
11/07/2024 COT - RSPL - Yard Water Line Passed 11-7-24, main water line inspection approved. Okay to backfill with shading.
11/07/2024 COT - RSPL - Sewer Passed 11-7-24, sewer connection inspection approved. Okay to backfill with shading.
11/07/2024 COT - RSPL - Rough Soil Passed 11-7-24, underground plumbing inspection approved. Okay to backfill with shading.
11/07/2024 COT - RSPL - Backwater Valve Passed 11-7-24, backwater valve inspection approved. Okay to backfill with shading.
11/15/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 11-15-24, preslab, setbacks, ufer, grounding/bonding, verified as per approved plans. Okay to pour slab.
11/15/2024 COT - RSBU - Preslab Passed 11-15-24, preslab, setbacks, ufer, grounding/bonding, verified as per approved plans. Okay to pour slab.
11/15/2024 COT - RSEL - Electrical Underground Passed 11-15-24, preslab, setbacks, ufer, grounding/bonding, verified as per approved plans. Okay to pour slab.
11/15/2024 COT - RSEL - Grounding/Bonding Passed 11-15-24, preslab, setbacks, ufer, grounding/bonding, verified as per approved plans. Okay to pour slab.
12/04/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 12-4-24, exterior clips/sheathing approved. Okay to continue with construction.
12/04/2024 COT - RSBU - Roof Nailing Passed 12-4-24, roof nailing,exterior clips/sheathing approved. Okay to continue with construction.
12/23/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12/23/24 pass
12/23/2024 BULD - Electrical Clearance Passed 12/23/24 TEP clearance code: ECO
12/23/2024 COT - RSPL - Gas Pressure Test Passed pass
01/10/2025 COT - RSBU - Interior Shear Bracing Passed Passed interior shear wall 1/10/25 ok to tape
02/25/2025 COT - BULD - SWG Clearance Passed 2/25/25: SWG CLEARANCE APPROVED OK FOR METER TAG
03/06/2025 COT - RSEL - Electrical Final Passed 3-6-25, outdoor lighting, electrical, mechanical, plumbing, building finals approved.
03/06/2025 COT - RSEL - Outdoor Lighting Passed 3-6-25, outdoor lighting, electrical, mechanical, plumbing, building finals approved.
03/06/2025 COT - RSME - Mechanical Final Passed 3-6-25, outdoor lighting, electrical, mechanical, plumbing, building finals approved.
03/06/2025 COT - RSPL - Plumbing Final Passed 3-6-25, outdoor lighting, electrical, mechanical, plumbing, building finals approved.
03/06/2025 ENGR Engineering Final Passed CO Ready
03/06/2025 RSBU - Building Final Passed 3-6-25, outdoor lighting, electrical, mechanical, plumbing, building finals approved.
03/06/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
241720 - VALENCIA CROSSING PH2- LOT 98- PT REPORT CORRECTED2-2025-02-04_V3.PDF DOCUMENTS VIEW
LOT 98 REVISED SPECIAL INSPECTION CERTIFICATE-2024-10-08_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 98 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 98 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 98 SPECIAL INSPECTION CERTIFICATE-2024-04-04_V1.PDF DOCUMENTS VIEW