Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
04/01/2024
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037

Permit Reviews

Permit Number - TC-MDP-0424-00381
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Start Date Submittal Complete Date Status  
09/06/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 09/23/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0424-00381
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Date Description Comments
04/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00381
Permite Description: DUPLEX DUPLVAL82 T22-M0037
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
01/14/2025 COT - BULD - SWG Clearance N/A Not Applicable
01/14/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
01/14/2025 COT - RSME - Mechanical Final N/A Partial Pass 1/14/25 no oven on site and first shower is missing faucet.
01/14/2025 RSBU - Building Final N/A Partial Pass 1/14/25 kitchen appliances must be installed to be considered move in ready.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00381
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Completed Inspections - 19
Date Description Inspector Results Comments
10/03/2024 COT - RSPL - Rough Soil Passed
10/08/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
10/08/2024 COT - RSBU - Preslab Passed
10/08/2024 COT - RSEL - Grounding/Bonding Passed Partial approval for UFER
10/21/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/21/2024 COT - RSBU - Roof Nailing Passed
10/23/2024 BULD - Electrical Clearance Passed
10/23/2024 COT - RSBU - Interior Shear Bracing Passed for interior fire wall
10/23/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/31/2024 COT - RSPL - Sewer Passed
12/31/2024 COT - RSPL - Yard Water Line Passed
01/14/2025 COT - RSEL - Electrical Final Passed 1/14/25 pass
01/14/2025 COT - RSEL - Electrical Underground Passed 1/14/25 pass
01/14/2025 COT - RSEL - Outdoor Lighting Passed 1/14/25 pass
01/14/2025 COT - RSPL - Plumbing Final Passed 1/14/25 corrections were made, faucet in bathroom has been installed. Pass
01/14/2025 ENGR Engineering Final Passed
01/14/2025 RSBU - Building Progress Passed
01/15/2025 COT - RSME - Mechanical Final Passed
01/15/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-634 W SIMMONS_V1.PDF DOCUMENTS VIEW